Non-Standard Automation Project Team Management: Why You Keep Having Problems — The Root Cause Is Not the People

2026-08-15 10:01:35

Preface: The Owner Who Firefights Daily — Is the Problem Really the People?

Last week I had tea with Mr. Zhang of the non-standard automation business. He pulled out his phone and showed me a pile of unread messages: design said the BOM was changed last week; procurement said it never received the notice and bought 3 wrong servo motors; the assembly team said two machined parts were missing — after searching warehouse and shop, they found them finished half a month ago sitting in the outsourcing area with nobody caring; with 5 days left before the agreed delivery date, the commissioning lead said 3 design errors remained unfixed, and the customer had already issued an ultimatum.

Non-Standard Automation Project Team Management: Why You Keep Having Problems — The Root Cause Is Not the People

Mr. Zhang sighed: he wakes up every day to firefighting everywhere. With a team of 12 people, even 3 projects a month descend into a pot of porridge — did he hire too few people?

Having worked 14 years in non-standard, I have seen plenty of this. Chaos in non-standard automation project team management is, the vast majority of the time, genuinely not a people problem — it is that the underlying information flow is wrong.

The Core of Team Friction: Information Scattered in Every Corner

Non-standard automation is inherently customized production: every project's configuration, parameters, and structure differ, and the project team is a temporary cross-departmental combination of sales, design, procurement, machining, assembly, and commissioning — coordination is inherently much harder than in batch production.

If managed the traditional way — information in personal Excel, requirement changes posted to WeChat groups, progress synced by meetings — problems are guaranteed.

The most typical case I have seen: a 30-person non-standard factory ran a photovoltaic testing device project last year. Design changed the BOM 3 times, each version posted only to the project group. Procurement happened to be watching three projects during that period and missed the updates, still holding the first-version BOM, and over-bought RMB 60,000 worth of power modules — discovered only at reconciliation. A week of wrangling followed: design said it posted to the group, procurement said it never saw it; in the end the boss paid the bill himself, and that profit was simply gone.

Many owners' first reaction is to add people, tighten assessments, dock wages and bonuses — but the underlying problem is never solved: without an information hub everyone can sync to, responsibilities cannot be bound to specific people, and when problems occur there is nothing but mutual blame-shifting.

To Manage the Team Well, First Bind "Tasks and People" Tightly

Non-standard projects differ from batch production: each project has a unique team configuration — from the overall project lead down to the operator of a single process. From initiation onward it must be explicit who does what and who to find when problems occur. No ambiguity.

The correct approach:

  • Bind responsible persons at project initiation: mechanical design lead, assembly lead, and commissioning lead are all bound into the project information; the project number is generated automatically, and customer information, target delivery date, and current status are clear at a glance. Whoever opens the project sees the corresponding responsible person — no asking department by department.

  • BOM drives whole-flow collaboration: after design finishes the BOM, all parts are classified into standard parts, self-machined parts, and outsourced parts, split with one click to the corresponding procurement, machining, and outsourcing links. BOM changes auto-sync to all related roles, so everyone always holds the latest version — wrong purchases and misassigned work are prevented at the root.

  • Bind machining to processes and reporting: every self-machined part is bound to its processes — who does which, planned hours, start and finish times — with status updated in real time via reporting. The planner no longer runs to the shop daily for progress; a delayed process is visible at a glance, allowing early coordination.

For example, Moges PMS9 is designed exactly on this logic: people and tasks are bound from initiation onward, with no extra time spent syncing base information.

Three Details That Stall Delivery — 90% of Teams Overlook Them

Many teams focus management only on front-end design and procurement while overlooking several inconspicuous back-end links — which are exactly what stalls the project's delivery:

Pain-point linkCommon problemCorrect practice
Commissioning processNo records; newcomers repeat the same mistakesRecord defects, rectifier, and closure time per commissioning round, following the project
Outsourced part follow-upBusy procurement forgets to follow up; assembly waits for partsBind the contact person and planned return date, auto-remind on due dates, keep acceptance results on record
Permission controlEveryone can modify data; errors hard to assignFine-grained permissions: design edits BOM, procurement orders, staff do not see costs — all operations logged

Do these three well, and the low-level mistakes disappear — "commissioning problems recurring", "outsourced parts missing for a week", "parameters changed without anyone knowing".

Do Not Run Team Management as "People Watching People" — Let Information Run by Itself

Many owners understand project team management as watching people all day: morning and evening meetings to sync progress, one big weekly summary. It looks disciplined but is actually a huge waste of time.

A 10-person team with half-hour stand-ups daily spends 25 work-hours a week — a full-time person doing nothing but meetings. Non-standard project schedules are already tight; this time could do far more valuable things.

Truly efficient team management solidifies the flow so information circulates automatically between roles:

  • BOM changed → automatically pushed to procurement and warehouse

  • Machining process completed → automatically notifies the next process to pick up

  • Inventory gap computed → automatically pushed to procurement for ordering

  • Node reached but not completed → automatic reminders to the responsible person and project manager

The owner does not need to visit departments daily asking about progress — opening the project list shows which link is stuck, and he directly goes to the responsible person to fix it. The energy saved can take more orders and improve customer delivery.

Summary: Non-Standard Team Management Is About Managing Tasks, Not People

Many think team management means managing people; in non-standard projects, it is essentially managing tasks. Sort out the nodes and responsible persons of every task, and costs naturally come under control and delays decrease.

Which link's cost overran — was it excessive design changes or overrun machining hours — is visible at a glance against the responsible person's output, without the boss assessing performance by gut feeling.

Non-standard automation lives on customization; a batch-production team management template cannot be forced onto it. No need to chase a big all-inclusive system — solve the two most common problems first, cross-departmental information gaps and unclear responsibilities, and team efficiency will jump a notch.

What is the most troubling problem in your team management right now? Check yourself against the three details mentioned above — the answer may be among them.