Introduction: The CEO is constantly firefighting, and the root cause of the problems lies in information silos.

At 8:30 AM, the owner of the non-standard automation equipment factory had just sat down in his office when the purchasing manager arrived: "Mr. Zhang, the import of sensors for the automotive component inspection equipment project has not yet been cleared, should we switch to an alternative supplier?" Immediately, the design supervisor arrived: "The BOM was updated to the third version last week; the original cylinder model is no longer needed, we must notify purchasing to stop," Then, the workshop director blocked the entrance: "In the assembly area, we are missing two parts due to a change in the model, and half of the parts have already been installed incorrectly."

In less than a day, the owner transforms into a firefighting leader, running around to coordinate, ultimately resulting in project delays and lost profits, as well as having to pay penalties for breach of contract. This is a common problem for owners of small, non-standard enterprises. Often, the issue is not a lack of employee capabilities, but rather the absence of a system that can integrate all information and manage non-standard automation projects. Everyone is essentially "blindly touching an elephant," leading to problems and an inability to identify the root cause.

Practical Case Study: Managing Non-Standard Automation Projects with a BOM-Centric Approach to Address Boss's Daily Concerns

Non-Standard Automation Project Dashboard Management: Using BOM as the Core to Solve Boss's Daily Anxiety

1. Non-standard and batch manufacturing boards are fundamentally different.

Many business owners, when implementing dashboard management, initially think of the traditional automotive and 3C industries' approach: creating a production line progress board with red and green indicators. This is a misconception. Non-standard automated equipment is inherently designed for single-unit customization. Each project has a unique Bill of Materials (BOM), and each part has a different source: standard parts procurement, outsourcing, and in-house fabrication. Any disruption in any of these processes can halt the entire project.

For batch manufacturing, Kanban management focuses on the efficiency of repetitive processes. For non-standard projects, Kanban management focuses on the status of each node in the entire process, highlighting the core difference. If you apply the logic of batch manufacturing to non-standard Kanban, the result is essentially a "big progress" dashboard that doesn't actually provide specific information, leading to problems.

2. Effective management of non-standard automation project dashboards requires close attention to four key areas.

Creating dashboards isn't just about listing projects and their status; it's about enabling users to drill down and see the specific issues at each stage.

1. Comprehensive project overview at a glance

The dashboard first ensures that all ongoing projects are clearly organized, with all key information readily available: automatically generated project numbers, linked customer information, specified target delivery dates, clearly defined current project status, and project team members. From project initiation, solution design, manufacturing and assembly, to testing and delivery, the first thing you see on the dashboard is the project's progress, without having to consult chat records or individually ask project managers.

2. BOM-driven status across all stages

The core of non-standard projects is that the BOM dashboard must be linked to the BOM. The type of each part (standard part, self-made part, or outsourced part), the current status of each part, and the quantity of missing parts or defects can all be viewed from the BOM hierarchy. After modifying the BOM, all stages will automatically update, preventing situations where the design is changed, the purchase order is updated, or the wrong materials are purchased. Furthermore, the parts in the BOM can be automatically split into procurement, outsourcing, and self-manufacturing stages, eliminating the need for manual re-entry and reducing the probability of errors.

3. Track progress at each stage without disconnection.

Real-time updates on the status of each stage, from processing to assembly to testing, must be visible on the dashboard. You can track where each manufactured part is in the process, whether external shipments have been received, whether assembly tasks have started, the number of debugging cycles, and any outstanding defects. This allows you to identify bottlenecks and proactively address issues before they lead to delays and prevent the situation where problems are only discovered when delivery is imminent.

4. Real-time cost collection

Many non-standard manufacturing companies only calculate profits or losses at the end of a project, making it difficult to track costs throughout the entire process. A good system can track the procurement costs, external processing fees, and internal processing labor costs for each project in real-time, allowing you to see exactly how much has been spent and whether you are over budget at any given time. This eliminates the need to collect and reconcile a large number of documents at the end of the month.

Key Capabilities of the DashboardExcel + Verbal Communication ModeCustomized dashboards (such as Moges PMS9)Improved results
Project OverviewReview chat logs, individually question personnel, lagging by half a day +Consolidate the status of all projects on a single screen, with refresh rates of seconds.Information retrieval time: 95%
BOM-drivenDifficult to synchronize changes, leading to frequent instances of buying the wrong items or missing items.BOM modification → Automatic synchronization of status across all stages.Material error rate ↓ 90%+
Stage-by-stage trackingDiscover missing parts or stalled processes only during assembly.Work order-level real-time status + overdue alertsDetect anomalies 3-7 days earlier.
Cost AllocationManual month-end reconciliation results in a 15%+ discrepancy.Automatic procurement/outsourcing/labor time collection, real-time visibility.Cost variance reduced to within 3%

Moges PMS9 is a project management solution centered around Bill of Materials (BOM), which integrates the status of the entire process. It eliminates the need for separate data reporting from different departments, thereby reducing coordination costs.

3. Three common pitfalls to avoid when implementing a dashboard management system.

Pit 1: Focusing solely on surface-level progress without linking it to actual business data.

Many dashboards simply display statuses like "processing" or "assembly in progress." However, it's impossible to see which parts are missing or which process is delayed, making it like "seeing the elephant in the dark." A good dashboard must be able to pinpoint the exact problem, whether it's a missing part or a delayed process, without requiring you to ask individual departments.

Pit 2: Either there is a lack of access control, leading to information leaks, or the processes become chaotic.

Many companies face a dilemma when implementing dashboards: either everyone can see all the information (such as project costs and customer quotes, which are accessible to all employees), or access is too restricted, requiring multiple requests and ultimately reducing efficiency. The ideal dashboard offers fine-grained permission control: different roles can view only the information relevant to their responsibilities. This includes: * Designers can only see the design-related information for the projects they are responsible for. * Purchasing staff can only see the purchasing requirements for the specific projects they are responsible for. * Only administrators and managers can access full data, ensuring transparency while maintaining control. This approach, often implemented using ERP and MES systems, allows for a clear and organized view of information, while also ensuring that sensitive data remains protected. For example, a company using Moges ERP and MES might implement a system where: * All project costs and customer quotes are visible to all employees. * Designers can only see the design-related information for the projects they are responsible for. * Purchasing staff can only see the purchasing requirements for the specific projects they are responsible for. * Only administrators and managers can access full data. This allows for a clear and organized view of information, while also ensuring that sensitive data remains protected.

Pit 3: Lack of synchronization of inventory information leads to delays and inaccuracies.

Many companies manage their procurement, warehouse, and project operations separately. This results in issues such as: procurement receiving goods without timely inventory updates, leading to discrepancies in the inventory management system; the inventory management system not being updated after receiving goods, causing inaccurate stock levels to be displayed; and incorrect production planning due to outdated information. The inventory management system must be automatically linked to the project Kanban, and the part status on the Kanban must be automatically updated after receiving or shipping goods, ensuring that the information is real-time and accurate.

Summary: The core of the dashboard is not about displaying large amounts of data, but rather focusing closely on each individual node.

Many small and medium-sized, non-standard manufacturing companies believe that implementing dashboard management is only for large enterprises, as the cost is too high for small factories. However, this is not the case. Even if only five or six projects are running simultaneously, a single delay or error can result in significant losses, which would be sufficient to implement a useful dashboard management system.

For non-standard businesses, the core of dashboard management has never been about creating a large display to showcase to clients, but rather about closely monitoring every potential point of failure and minimizing errors, reducing material waste, and avoiding late deliveries. The resulting gains far outweigh the initial investment.

When managing your Kanban, do you prioritize either progress or cost? If the answer leads you to believe that your current management methods need to be upgraded, perhaps it's time to talk to Moges about Moges PMS9.