Why Our Production System Ships with Off-Site Backup and Restore Drills by Default

2026-09-28 20:11:04

In the 14 years we have been building factory production systems, what most often gets us called in by customers in the middle of the night is usually not a slow system but "the data is gone": the ERP account set will not open, the database will not start, or the production order table has been deleted by mistake. Having seen this so many times, we set a rule early on: for any system we deliver, backup and the ability to restore must be standard out of the box, not something patched in afterwards when a problem appears.

1. Automatic Backup from Day One, in Two Copies

For Moges PMS9 and PMS5, the two production management packages, we turn on automatic backup on the very first day they are deployed at a customer site: the database is written to disk on a schedule, attachments such as process drawings and work reporting records are backed up separately, and a copy is sent off-site, either to another machine room or to the cloud. Most factories do not have the time to look after this themselves, so we make it a default action, delivered together with the system at go-live rather than offered as an optional add-on.

2. A Backup Is Not the Same as Being Able to Restore, So We Make Restore Drills Mandatory

Quite a few factories "assume" they have backups, and only when something really happens do they discover that the backups are corrupt or that nobody knows how to restore them. Our practice since 2012 has been to write restore drills into the process: after a new system goes live, we must actually pull the data back from backup once to verify it, and we re-run the drill regularly in normal times. A factory that has drilled can restore critical business within hours when a real crash comes; one that has not drilled often drags on for days.

3. Why This Is the Same Thing as "Doing Data Recovery for Factories"

Ultimately, data recovery tests not a single firefight but how familiar you are with the data path day to day: whether the fault is a process, a disk, or logical corruption of the file itself. Judge the direction wrong and you end up overwriting a scene that could still have been saved. We work with backups, replicas, and restores every day, and hundreds of manufacturing customers in Jiangsu have come through this way, so when someone else's system crashes, we know straight away to preserve the scene first and decide the direction second.

4. Real Scenarios with Local Customers

Many of the mold shops and machining shops around Kunshan and Suzhou are our customers. Their production systems run to our delivery standards, but it is also common for systems built by others to fail after years without maintenance, with a call for help in the middle of the night. We take on a lot of this work, and after recovery we usually help them fill in the missing backups and drills along the way, so they do not fall down again next time.

Summary:

We dare to take on factory data recovery not because we learned it on the spot, but because 14 years of treating "a backup must be restorable" as part of everyday delivery have trained it into us. If you are planning to launch or overhaul a production system, we suggest considering data reliability together with the system itself: waiting until the day the account set truly will not open to look for help will multiply both the cost and the production downtime loss several times over.