How to solve the problem of disorganized loose parts inventory? A four-stage process for mold factories, from chaos to order.
2026-10-07 09:33:44
In every mold factory and machining workshop, there's always a troublesome corner. This corner is filled with several metal cabinets, each containing numerous drawers, and each drawer is packed with springs, punches, cutting tools, dies, guides, and sleeves. While the individual cost of these spare parts is relatively low, the total number of different types can easily reach thousands. When work orders are processed, machinists often spend a lot of time searching for the specific parts they need, and material managers have to rummage through multiple drawers to confirm the exact inventory levels. Additionally, occasional audits by workshop supervisors can reveal discrepancies of up to 20% between actual usage and recorded inventory.
This is not a problem unique to any particular factory. The long-standing chaos in managing loose parts stems from the inherent properties of these parts themselves, which render traditional warehouse management methods ineffective. The four key characteristics – small size, low value, high variety, and frequent movement – combine to make it impossible to manage loose parts effectively using simple manual record-keeping or Excel spreadsheets from the outset.

1. The true cost of disorganized loose parts inventory is not just the cost of the materials themselves.
Many managers only focus on the purchase amount when calculating inventory. For example, a bolt costs $2.50, and a spring costs $3.00. This makes the total cost of loose parts appear to be a small percentage of the company's raw material budget. However, if you shift your focus away from the unit price of materials, you will find that loose parts are actually consuming three other things.
The first is downtime. The injection mold requires new pins, the CNC machine needs a replacement locating pin, and the warehouse says "it should still be there," but after 20 minutes of searching, it's not found. A temporary worker is dispatched to purchase the parts from a hardware store, which takes an hour round trip. During this hour, the entire injection molding machine or CNC machine is idling. For discrete manufacturing, the cost of an hour of downtime far exceeds the price of the few individual parts.
The second issue is over-ordering. Due to a lack of accurate inventory information, materials personnel tend to "buy extra to have on hand." Even though there are 300 springs remaining, a purchase order is still placed for 600 springs. After six months, 2,000 springs of various specifications are piled up in the warehouse corner, while the five standard springs are still frequently out of stock. Over-ordering not only consumes working capital, but also increases storage space and inventory management costs.
The third aspect is quality traceability and fault analysis. A batch of products had size issues, which were traced back to worn mold bushings. However, the system could not determine when this batch of bushings were replaced, which batch they belonged to, or which supplier provided them. The informal "take and go" process for picking individual parts often lacks formal procedures, such as linking to work orders and recording the equipment used. This makes it impossible to trace the source of problems after they occur.
II. Comparison of Common Piece Part Management Methods
Among the dozens of mold and machining customers I have interacted with, the approaches to loose parts management can be broadly categorized into four main types. There is no universally "good" or "bad" approach; rather, the suitability depends on the specific needs of the business.
| Management approach | Typical approach | Advantages | Disadvantages | Suitable Applications |
|---|---|---|---|---|
| Fully manual type | Steel cabinet + small drawer + handwritten card | Initial cost is zero. | Discrepancy between accounting and actuals ≥ 30%, inability to trace | Workshop-style factory, variety of parts |
| Excel-based ledger system | Manual data entry from spreadsheets for inventory management. | Clearer and more easily backed up than handwritten notes. | Data updates are delayed, and multiple users maintaining the system can lead to conflicts. | Type of items: 200~800, low frequency of incoming and outgoing. |
| RFID Tag Type | Each item is labeled and scanned by a reader. | Automatic data collection, high accuracy. | High unit cost, and it is difficult to apply labels to small, individual pieces. | High-value loose parts (unit price > 50 yuan) |
| MES/ERP Integrated Solution | System scanning for inventory management, linked to work orders. | Real-time accuracy, automatic alerts, and traceability. | Requires initial system deployment and process optimization. | Number of SKUs > 500, Multi-workshop collaboration |
A common problem with both of the first two methods is the disconnect between data and physical inventory. The speed at which manual data entry can be completed will never keep pace with the speed at which technicians retrieve items from drawers. By the end of the month, the figures in the ledger will already be several streets away from the actual inventory. While the RFID solution sounds perfect, for most mold factories, attaching three-dollar tags to a two-cent screw is clearly not cost-effective.
The most effective implementation is the fourth option: integrating loose parts management into a unified inventory module within MES or ERP, combined with barcode scanning and work order binding. The Moges PMS9 system has been specifically optimized for loose parts scenarios, such as supporting barcode scanning for entire boxes (with 100 parts each, each with a barcode), which solves the cost problem of individual labeling while ensuring accurate record-keeping of inventory quantities.
Three. A Four-Step Path from Chaos to Order
1. Identify and Analyze the Root Causes of Inefficiency 2. Develop and Implement Targeted Solutions 3. Monitor and Evaluate Progress 4. Refine and Optimize Processes
The overhaul of piece part management does not require a complete restart or waiting for the entire system to be fully implemented. It can be implemented in four stages, with each stage having clear deliverables and measurable results.
Step 1: Assess your current situation.Empty all loose parts from drawers and sort, count, weigh, or measure them according to specifications. While this step may seem straightforward, many factories get stuck here – no one wants to spend an entire three days counting springs. In reality, this is the most critical step. Without accurate initial inventory data, all subsequent data will be meaningless. The Moges implementation team typically recommends that customers form a team of two skilled technicians and one warehouse staff member to complete the inventory in two days, while also entering each part specification into the system and assigning it a unique code.
Step two: Define the rules.Once the inventory is completed, three simple but essential rules should be established: all items taken must be scanned (even a single screw), all remaining loose parts at the end of an order must be returned, and the minimum inventory threshold must be entered into the system. The fewer the rules, the easier they are to implement. Many factories prefer to create lengthy management documents, but the workers often forget them or refuse to follow them. These three rules, totaling less than 200 words, can be placed at the entrance of the warehouse for easy understanding.
Step 3: Set up alerts.
Step 4: Conduct a review. Export monthly component usage data and analyze which specifications have abnormal consumption (either lost or incorrectly used), and which specifications have been inactive for a long period (due to over-ordering or replacement). The purpose of this step is not to identify who used extra springs, but to identify process flaws from the data. For example, if the consumption of a specific spring specification is twice the system record for three consecutive months, this indicates that either the work order is not properly linked or there is a problem in the return process.
4. Two easily overlooked details
During the remediation process, two specific details are particularly prone to being overlooked, but if not addressed properly, they can completely undo all progress.
The other is the coding system. The coding for loose parts should not only use numerical numbers, but should also include specification information. For example, a top pin can be coded as DZ-φ10×150-01, where DZ represents top pin, φ10×150 represents diameter and length, and 01 represents material. This allows workers to identify the correct specification by reading the code when receiving the parts, eliminating the need to individually unpack and verify each item.
Another key feature is the material return process. Many factories only manage incoming materials, neglecting the return process. When a work order is completed, the remaining parts are simply piled up on the workbench, to be used again later. This results in inventory records that are always lower than actual stock. The material return process does not require complex approvals; the operator simply scans the work order code and then the part code, and enters the quantity being returned, which takes only 10 seconds. The Moges system even supports bulk returns – after a work order is completed, the system automatically prompts "Do you want to return the remaining materials?" with a confirmation, and the process is complete.
Conclusion
Managing loose parts inventory might seem like a minor detail, but it's a mirror reflecting the overall level of fine-grained management in a factory. A workshop that can't even manage a single spring is unlikely to be able to manage the complex lifecycle of molds or the traceability of precision parts. Conversely, when loose parts inventory is managed with accurate accounting, traceable inbound and outbound movements, and the ability to proactively alert about shortages, other aspects of management are typically also well-managed.
"There's no need to wait for the 'right time'." Starting today, find a drawer, clearly identify the different types of components inside, and assign a code to each one – this is the first step in bringing component management from chaos to order.