The Days the Veteran Master Took Leave, and the Work Never Stopped
2026-10-19 10:16:08
Who is the person a plant can least do without? Ask ten small-plant owners, and eight will give the same answer: the veteran master who has been there for twenty years.
Lao Han thought so too, until last month, when Lao Zhang of his turning team went back to his hometown to arrange his mother's funeral and took a week's leave.
On the third day of Lao Zhang's absence, a string of small mishaps hit the plant: one batch should have been rough-turned before finish grinding, but the new apprentice mixed up the order and went straight to finish grinding, and eight pieces had to be reworked; for another batch, the drawing circulating on the shop floor was last week's old version, and only Lao Zhang's head held the fact that the dimensions had been changed, so by the time it was discovered, three pieces had been ruined; and for one order, no one could remember which subcontractor the second operation should go to, because that subcontractor's contact information was stored in Lao Zhang's phone.
During that week Lao Han's phone never stopped ringing. Lao Zhang took six calls beside the funeral hall, and every one of them began with "Master Zhang, about this..."
The man came back, and things settled down. Lao Han squatted at the shop entrance smoking, but what he was thinking about was not this past week - it was the next five years: Lao Zhang is fifty-six this year.

1. The Plant Is Not Afraid of Losing a Person - It Is Afraid the "Way of Working" Leaves with Him
Let us be clear about one thing first: the veteran master is the plant's treasure, and that will never change. The problem is not the person; it is that the know-how of how this plant works is all stored in one master's head - when he leaves, the know-how clocks out with him.
This kind of "being tied to a person" is invisible in normal times, and may even look like efficiency: shout and someone answers, faster than looking anything up. It only shows its true face at three moments:
The moment the master is away. Leave, illness, a trip home - the plant immediately slows down. It is not that there are too few hands - everyone is there - it is that no one knows "in what order this batch should be run, whether the drawing is the latest version, and which subcontractor this process goes to." It is not that the apprentice is unwilling to work hard; it is that no one has given him an answer he can follow.
The moment the master is too busy. When he is there, the whole plant queues up to ask him: which drawing version should I look at for this dimension? Which operation comes first? He actually spends very little of the day machining at the machine tool; most of it goes to being a "living instruction manual." He has become the plant's bottleneck - and he is exhausted too.
The moment inside the master's head. When there are family matters or he is not feeling well, his mind inevitably has gaps. A plant propped up by memory is a plant that bets production quality on one person's daily condition.
Many bosses sum this up as "the plant is still small, that is just how it is." In fact, it is the other way around: precisely because the plant is small, it can least afford for any single person to hit pause. In a plant of fifty, if one link is missing, someone covers it; in a plant of a dozen people, if one veteran master is missing, that piece is truly empty.
2. The Root Cause: This Plant's "Way of Working" Was Never Archived
Look at Lao Han's week from another angle: the eight reworked pieces came from a work sequence that existed only in words; the three ruined pieces came from a drawing version with no ruling on "which version is authoritative"; the missing subcontractor came from experience stored in a private phone.
Three events, one root cause: how this plant works has never left people's heads.
Some bosses will say: then I will write the rules down and put them on the wall. Anyone who has tried knows where the difficulty lies - rules are fixed, but the work changes: this batch's processes differ from the last batch's, the drawing changed dimensions again this week, the subcontractor switched to a closer one. Paper rules are out of date the moment they are finished; three months later, that sheet on the wall is just decoration.
Rules do not stick, not because people are too lazy to write them, but because the work itself changes every day, and paper cannot keep up. Only one thing can keep up: record "how this particular order is to be run" on the order itself - which step the order has reached, which drawing version it follows, what the next operation is - all traveling with the order, instead of traveling with someone's memory.
This is what "not tied to a person" really means: not that the veteran master is no longer needed, but that the master's craft becomes a standard shared by the whole plant; the apprentice works to the standard, and the master frees up his hands for the things only he can do.
3. Storing the Way of Working in the System Rests on Four Things
Moges PMS5 is a SaaS production management system for discrete machining plants with fewer than 50 people, built around production execution (MES) and extending upward to a lightweight ERP covering orders and business finance. The four things above are how it stores the "way of working" in the system:
First: turn the work sequence into process-section standards. Which process sections the plant has, what work each section does, and which section work flows to from which - defined once in the system, this becomes the whole plant's shared baseline. When a new order comes in, the processes are laid out from this baseline, and who goes first and who goes next is crystal clear; a new apprentice can open the work order and see it, without crowding around the master to ask. Process-section standards can also be copied - for a similar part next time, pull one out, change a thing or two, and you have a new one, without starting from zero. Defining standards is a one-time investment that benefits the whole plant, and not just the boss: the veteran master no longer has to be a broken record, and the apprentice no longer has to guess.
Second: hand drawings to version management, and no one may decide "which version is right" from memory. Drawings are uploaded into the system; every revision is recorded, and every version is kept, downloadable, and tagged with its upload record. When the shop is ready to work, it takes the current version from the system - not from a WeChat group, and not by asking the master "is this the one that was changed?" An earlier article covered the cost of drawings whose versions cannot be controlled; here we add only the connection to "being tied to a person": once "which version is authoritative" has a single answer, the drawing ledger in the master's head changes from "must remember" to "happens to know." A person can take leave; the latest version cannot.
Third: every work order carries its own processes as it moves. Once an order is created, the process sections it will pass through are attached to it; work one section, report one section - scan at start, scan at completion. Which operation it is at and how many remain are written on the order itself. Whoever takes over the shift or covers the post reads the order instead of asking people. This is what "the way of working recorded on the order" means - people change shifts, but not one step of the route on the order is missing.
Fourth: report in the prescribed sequence, and mistakes are visible on the spot. Workers report at the process-section level: this section has started, this section has finished. If the sequence is wrong or a section is skipped, the progress dashboard will not line up, and it shows up quickly - not after the parts are ruined. This light constraint of "following the order" works better than ten rules posted on the wall: the rules travel with the work, and wherever the work goes, the rules go.
Once these four things are done, what Lao Han worried about looks completely different: when Lao Zhang takes leave, the process-section standards are in the system, and the apprentice works according to the order; the latest drawing version is in the system, so whoever takes it gets the right one; and which step each order has reached can be seen on the dashboard, with no need to call his hometown.
This is exactly what Moges PMS5 does - it cannot keep any single person at the plant, but it moves "how to work" out of people's heads and turns it into a standard the whole plant can draw on at any time. The veteran master is still the most valuable person, only now the plant no longer stakes everything on him alone.
4. Will Standards Strangle the Plant?
Plants doing single-piece, small-batch work fear being bound by rules most of all - today this batch's customer wants a different bore size, tomorrow that machine has a temporary problem, and living work cannot be blocked by a single flow. This worry is very real, so the division of labor between the system and people must be made clear.
Process-section standards define "how it usually goes," not "how it must go." If a certain order needs a different sequence, a skipped section, or an added operation, adjust it on the order itself; you are changing this order, not the plant's baseline; after the change, a trace is left on the order, and when you later ask why it was done this way, the answer is on the order. Exceptions always exist; the difference is: without a system, exceptions exist only in the master's head, and he both decides and cannot explain; with a system, exceptions land on the order, and what was done and why is visible to the whole plant.
There is one more layer: judgment always belongs to people. Whether this order goes first or later, whether a given master can cover the post, whether a given subcontractor is reliable - the system makes none of these judgments for you; it has neither the ability nor the authority. What it manages is "recording clearly and passing along what has been decided," freeing the boss and the master from "remembering" so they can use their brains for judgment.
So setting standards is not locking the plant down; it is handing "remembering the rules" - work a machine can do - to the machine, and leaving "making the call" - work a machine cannot do - to people. The craftsman's most valuable asset, judgment, becomes more valuable than ever.
Some veteran masters still have a knot in their hearts that deserves to be addressed head-on: if the way of working is written into the system, will my craft be "stolen"?
No, because this is accumulated naturally, not pulled out of anyone's head. The process-section standards are a baseline that the boss sets together with the masters, and the moment it is set, the master has lost nothing; every record afterward is left casually by scanning during shop-floor work - which processes today's batch went through, when this drawing version was uploaded - these come into being as the work is done, not because anyone was asked to "write down your skills and hand them in." The master's craft lives in his hands; what accumulates in the system is the trace of the whole plant's work. Not a single bit was taken from him; instead, the plant gained an asset anyone can use.
There is another layer too: as long as the habit is watched closely for the first two weeks, the results will speak for themselves: standardization running in the system is more stable than running in people's heads. This is not because veteran masters are unreliable - people have states: when overwhelmed, when tired, when distracted by family matters, the ledger in the head may lose pages; the system takes no leave, is never distracted, and will not skip an operation just because today is crowded with varied work. People are reliable through experience and a sense of responsibility; the system is reliable because "it has no physiological conditions for getting it wrong." With both in place, the plant is truly stable.
5. Three Kinds of Plants: Where They Differ
| Dimension | Way of working in the head | Way of working on paper | Way of working in the system |
|---|---|---|---|
| --- | --- | --- | --- |
| Master takes leave | Plant slows down, phone calls chase him to his hometown | Work done to outdated paper, rework | Apprentice works to the work order, progress continues |
| Newcomer onboarding | Follow the master for three months, depends on aptitude | Paper rules do not match reality | Open the work order and follow the processes |
| Drawing versions | Ask the master, he has the final say | Dig through folders and hope | Only the current version is taken from the system |
| The master's energy | Half spent being a "human manual" | Repeating instructions | Hands free for high-value work |
| Taking rush orders / expanding capacity | Dare not take them; taking them means chaos | Barely take them, relying on overtime | Add people who work to the standard; expansion is feasible |
| Five years later | The person leaves, the craft leaves, start over | Paper piles up, no one reads it | The way of working settles into a plant asset |
How a plant gets out of firefighting mode - The Firefighting Captain and the Composed Boss covers the other half: keeping information from bottlenecking at the boss. For the cost of not being able to say which drawing version is authoritative, see What to Do When Drawing Versions Cannot Be Controlled. On whether to nod before taking an order, see Some Orders You Dare Not Take, Not Because You Cannot Make Them, but Because You Fear You Cannot Control Them Once You Do. Newcomers who want a systematic start will find complete chapters in the Quick Start Guide for Beginners and the product page.