When Exception Types Are Not Classified, Quality Improvement Stays Based on Impressions

2026-10-25 19:07:59

The first stumbling block in quality improvement is not technology but language: an issue found in-house is called a "ding", an issue coming back from an outsourced processor is called a "cosmetic defect", the same kind of event has two names, and at month-end statistics they never end up in the same table. This article explains the solution in Moges PMS5: one exception type dictionary shared by in-house exceptions and outsourcing exceptions.

When Exception Types Are Not Classified, Quality Improvement Stays Based on Impressions

1. Why the Dictionary Must Be Shared

In many shops the quality records and the outsourcing records are two separate books, with types named independently. The consequences:

  • Problems on in-house parts and outsourced parts cannot be compared - how much worse outsourcing quality really is compared with in-house work can never be stated
  • The same kind of defect is registered under different types, so the distribution statistics are completely distorted
  • The two departments even call the same problem differently, so meetings start with ten minutes spent aligning terminology

The logic of a shared dictionary is simple: the essence of a problem is the defect, not whether it happened inside or outside the plant. "Dimension out of tolerance" is dimension out of tolerance, whether it came off your own machine tool or from a supplier - only defects with the same name can be accumulated, and only accumulated defects can be improved.

2. How to Define the Dictionary: A Dozen or So Entries Cover Eighty Percent of Cases

The principle for customizing an exception type dictionary: induce it from real exception records, do not copy it from a textbook. A typical starting structure:

  • Dimension: out of tolerance, hole position offset, geometric tolerance exceeded
  • Appearance: dings, scratches, impact marks, corrosion
  • Material: defective incoming material, wrong material used, heat treatment problems
  • Assembly: interference, wrong assembly, missing parts
  • Quantity: short shipment, wrong delivery

A dozen or so entries are enough to cover the vast majority of cases. The decision principle: the cost of ticking a box must be lower than writing a sentence - if dictionary entries are too many and too fine, the person registering gets annoyed, and the records die.

3. Where the Records Hang: The Exception Ticket Is the Carrier

The type dictionary is not an isolated list; it grows on the exception ticket. Taking the quality exception ticket as an example: when registering an exception, besides ticking the type, three things must be recorded together:

  • Defect description: the dictionary assigns the broad category, the description records the reality - "dimension out of tolerance" is the type, "a φ50 hole actually measured φ50.15" is the reality, and the two complement each other
  • Problem operation stage: which process step the problem came from, hung on the specific operation stage of the work order
  • Array of responsible persons: there can be multiple responsible persons; an exception caused jointly is not forcibly pinned on one person

The same applies to the outsourcing exception ticket: the type is chosen from the same dictionary, and the outsourcing vendor is attached. One ruler inside and outside the plant is what makes the measured data comparable.

4. How to Use the Distribution: Once a Month, Look Only at the Top

A month of type records is enough for one distribution review:

  • Ranking of exception types - the top two often account for more than half
  • Cross comparison of in-house versus outsourced - who has more of the same defect, and where improvement resources should go
  • Cross analysis by problem operation stage - whether a certain defect clusters at one process step

Improvement resources are always limited, and attacking the top types gives the best return. After reviewing the distribution, set one or two improvement measures and check the trend next month - once this cycle turns, the quality meeting changes from a session of impression-based complaints into a data-driven scheduling meeting.

5. One Discipline

Dictionary revisions must go through a process: adding categories is fine, casually renaming is not - rename "ding" to "impact damage" and the historical data breaks. The type dictionary is a statistical definition, and once the definition changes, all trends are void.

The exception type dictionary grows on the exception ticket; for the exception ticket mechanism, see Quality Exception Management; for exceptions on the outsourcing side, see Outsourcing Management End to End. Learn about the product: Moges PMS5.

---

« Back to News list