Who Changed This Work Order? The Operation Log Records Every Edit
2026-10-26 13:41:41
"Who changed this work order? What was the original quantity? Why was it changed?" — these are the three most expensive questions in management, and the answer that usually comes back is "I forgot." This article is about the work order operation log in Moges PMS5: it lets every single edit leave a complete record of its own.

1. Which Actions Are Recorded
The key operations across the work order lifecycle all go into the log: creating an order, editing, reporting work, adjusting process steps, handling exceptions... Each log entry records five things:
- Operation type: what action was taken
- Operation target: whether the change touched the work order itself, a specific process step, or a work report
- Changed field: which field was modified
- Value before and value after: what it was before the change and what it became afterwards, each retained separately
- Reason for the operation: why it was changed — this field is mandatory, and edits without a reason are discouraged
Add the operator and the operation time, and the complete record of a single edit is in place.
2. Why the "Value Before" Must Be Kept
Many systems only record "what it was changed to" and never "what it originally was" — half-baked traceability. The benefit of keeping both the before and after values pays off completely when disputes arise:
- The customer says "I ordered 20 pieces." Check the log: the order was created for 20 pieces, then on a certain day at a certain time a certain handler changed it to 15 pieces, reason "customer order change" — the original agreement, the change, and the basis, one chain
- A work report quantity was adjusted, and both values are there — costing uses the adjusted figure, dispute tracing uses the figure before adjustment
The point of a log is to make history exist in a way that cannot be tampered with, not to make everyone afraid to change an order.
3. "Reason for the Operation" Is an Underrated Field
A mandatory reason looks troublesome at first glance, but in practice it is the most valuable field in the entire log:
- Looking back, the reason is the key to understanding each change — was the quantity changed from 20 to 15 because the customer cut the order, or because material was short? The answer determines the next move
- Looking in aggregate, the distribution of reasons exposes process problems — if a certain type of change frequently carries the reason "customer change," order acceptance review should be tightened; if "data entry error" appears frequently, entry training needs topping up
After three months of accumulated data, the operation log is no longer just an audit tool — it is a health check report for process improvement.
4. Three Things the Log Changes
Once the operation log is running, three things in shop floor management quietly change:
Disputes get shorter. Any dispute starts by pulling up the log; the facts are on the screen, and the argument shifts from "who said what" to "what do we do next."
Reckless changes become fewer. Knowing that every edit leaves a trace makes people think before they act — many "casual edits" simply disappear in the face of a mandatory reason.
Handovers stay continuous. When staff change, the log is the working draft of the handover: the history of every order can be checked at a glance, without depending on anyone's memory.
5. One Reminder
The log is a management tool, not a camera monitoring employees. The stance for using it should be "make the facts checkable," not "catch whoever made a mistake" — with the right stance the log has vitality; with the wrong one, people will find ways to work around the system, and that is the real disaster.