Design Philosophy of Mold Manufacturing Production Management

2013-12-31 00:00:00

At present, a typical mold company has many production tasks, with both personnel and equipment resources under strain. Combined with the characteristics of one-off, small-batch mold production, production managers mostly rely on their own management experience, coupled with a limited understanding of equipment resource availability, and must formulate mold production plans in a very short time. The consequence of this current planning mode is that, in the actual mold production process, it is difficult for the plan to genuinely guide the assignment of machining tasks on the shop floor. The workshop must repeatedly draw up its own production and processing plans, resulting in a mismatch between the plan made by the production department and the workshop's actual machining tasks, and the progress of molds and workpieces cannot be controlled in a timely way. Mold production management problems are fairly prominent and have become one of the difficult points in many mold companies' management. The root cause of this situation is that when mold production planners make plans, it is hard for them to quickly and accurately grasp the resource load of personnel and equipment using traditional management methods, and hard to grasp the resource needs of all molds in progress and parts awaiting processing in a short time, and they cannot perform large volumes of fast, scientific calculations for scheduling. Thus at the planning level they cannot accurately and detailedly work out a production plan that reflects the actual resource load, which in turn makes it difficult to execute and control at the execution and control level. The current mode of making plans is heavily colored by personal experience and is quite blind; some are nothing more than a production notice. So it is hard to actually produce according to such a plan in the workshop or for it to play a guiding role. This leads to inaccurate mold production plans, an inability to control processing progress in a timely way, and large deviations between plan and reality. It also causes processing tasks to change constantly at the last minute, leaving production and processing often in a disorderly state, with a large increase in sudden outsourced work, and processing quality and delivery times hard to guarantee. In actual management, performance evaluation becomes a mere formality. So production department staff often work overtime, constantly becoming "firefighters" endlessly putting out fires, yet still unable to solve these problems at their root — this has long been one of the prominent management difficulties for many mold companies.

Design Philosophy of Mold Manufacturing Production Management

After deeply studying the root causes of this phenomenon, we specifically developed a mold production management system. Focusing on manual visual production scheduling and computer-automated scheduling for mold production management, it is designed specifically to solve this management difficulty in mold production. Through statistical calculation of resource loads in the scheduling system, production planners can quickly and conveniently grasp the load requirements of monthly plans and daily production plans; through the large volume of fast calculations in the computer scheduling system, equipment resources, materials, and human resources can be organically combined with factors such as process labor hours and mold delivery dates, forming effective production scheduling tasks and lists of outsourced machining tasks. At the same time, molds and key parts that are delayed are warned about in advance before machining, so the company can arrange outsourcing in a planned way or communicate with customers ahead of time, resolving the factors of mold delay before production begins — thus not only effectively guaranteeing delivery time. Because scientific scheduling through the computer system greatly reduces the inaccuracies of manual scheduling that previously caused constant plan revisions, production and processing enter a virtuous cycle, which not only guarantees processing quality but also greatly reduces temporary emergency outsourcing and substantially cuts the number of delayed molds. Meanwhile, during plan execution, timely and effective collection of part-processing progress data lets the system display at any time the processing progress and status of every mold and workpiece, allowing production staff to monitor actual progress at any moment. Even if an anomaly occurs, the system immediately feeds back an alarm, improving the speed of timely handling so that many problems causing mold delays can be dealt with promptly. This effectively improves mold delivery time.

« Back to News list