This article was written by a team of senior consultants who summarized more than ten years of mold factory management experience, sharing some of their views on this platform in the hope of hearing everyone's different opinions and insights!

Mold Production Management System
Molds have long been called the "mother of industry." The level of a mold industry is one of the important indicators of a country's manufacturing level! Mold production management system.

Mold enterprises are typical order-oriented, single-item multi-variety production enterprises. Their main development process includes: product design, mold design, precision machining, bench assembly, trial running, trial production, and mass production. (Structure shown in the figure below)
The main work to be completed and control points at each stage are as follows:

I. Product analysis stage: conduct a preliminary analysis of the product, mold, production, and quality, including parting surface conditions and whether a robotic arm is needed, and complete the mold-opening analysis report DFX (Design For X, where X includes Product Tooling, etc.);
II. Mold design stage: after the assembly drawing is completed, a comprehensive design check of the assembly drawing must be performed according to the CTD (Checklist of Tooling Design). After confirmation, all drawing files are effectively stored and managed (Design Document Control); a materials list is gradually produced, and as the drawings are refined, the final BOM (Bill Of Material) is generated;
III. Precision machining stage: first inspect incoming materials from suppliers through IQC (In-coming Quality Control); after ensuring the materials are qualified, machine according to the set MAPA (Machine Parameter). After machining is complete, in-process inspection IPQC (In-Process Quality Control) is required to guarantee the quality of each process.
IV. Bench assembly stage: carry out factory inspection PSI (Pre-shipping Inspection); after completion, send to the trial-run workshop, simultaneously preparing machines, materials, and other items before the trial, and conduct the trial run TRO (Tryout);
V. Trial run, trial production, and mass production stage: perform product dimension inspection TVR (Tooling Verify Report) and mold problem inspection TIR (Tryout Issue Report), using these two points to guide mold modification MPI (Manufacture Processing Instruction of mold modification). This cycle repeats until the mold passes acceptance.

Through effective control of all the stages above, the perfect delivery and use of the mold is finally guaranteed. Combining the above mold development process with the design principles of a management system, the mold management system can be planned into the following functional modules:

I. Business management: customer management, specification management (DFX), estimate and quotation management, order management, engineering change management;
II. Design management: drawing file management (CTD/DDC), materials list management (BOM), CAD software interfaces;
III. Workshop management: project management, work order management, process and scheduling management (MAPA), dispatching management, quality management (IQC/IPQC), and floor management;
IV. Inventory management: receiving/returning materials, outbound/inbound management, transfer and stocktaking management;
V. Procurement management: supplier management, outsourcing management, requisition management, purchase management;
VI. Trial-run management (TRO): PSI, TIR, TVR, MPI;
VII. Human resources management (HRS): including organizational structure, permission assignment, attendance management, and payroll management;
VIII. Basic configuration module: initial settings according to the company's actual situation, such as the company calendar, approval definitions, materials, processes, and currency definitions.

Mold production management system.

The main module structure is shown in the figure below:
Following the above planning of the mold system and combining it with the current classification of IT industry products, we can obtain:
1. Human resources management, business management, procurement management, and inventory management belong to the typical scope of an ERP [Enterprise Resource Planning] system;
2. In design management, customer drawing files must first be managed. At the same time, designers need to manage the design drawings of every mold, including versions and permissions, and these drawings need to be used continuously through the various relevant workstations before mold transfer, until handed over to the customer. This is a typical PDM (Product Data Management) system;
3. In the scheduling part of workshop management, because molds have many parts and each part requires many machining processes, while the enterprise's equipment and human resources are limited, the scheduling workload is heavy. Take the front cover of a laptop as an example: one mold has about 50 parts to machine, each part averages 6 processes, there are nearly 200 electrodes, and 10 molds run on the floor simultaneously — that requires scheduling more than 5,000 processes. If in actual machining some parts need rush orders inserted or processes are delayed, timely adjustments are required. To cope with such a huge data volume and frequent changes, APS (Advanced Planning and Scheduling) is needed.
4. Floor management in workshop management belongs to MES (Manufacturing Execution System);
5. Trial-run management currently has no dedicated system and requires customized functions.

From the above analysis, only by combining the existing ERP, PDM, APS, MES, and customized mold trial-run management systems on the market can the management needs of mold factories possibly be met. For such a huge system, implementing it through system interfaces with any single category of software involves considerable technical difficulty as well as very large costs. Even a fused system using existing management systems would, because of the mold's own make-to-order, single-item production characteristics, make processes cumbersome and affect efficiency.

Therefore, only by adopting a dedicated mold management system targeted at the mold industry can mold enterprises be helped to manage more effectively. Besides the basic modules above, this management system must also organically integrate the various modules according to the actual mold process to bring greater benefits to mold enterprises. A few simple examples:

I. In business management, after signing an order with a customer, payment is collected in three stages: before mold making, the first trial run, and acceptance. When the actual on-site work reaches the corresponding stage, the system needs to automatically remind sales to collect payment.
II. After design drawings are reviewed and confirmed, the drawings need to be automatically classified to the relevant parts. When floor staff machine a part and scan the barcode, the corresponding drawings can be read automatically.
III. After automatic scheduling arranges the relevant processes, if labor hours run late or early during workshop execution, the schedule needs to be re-simulated automatically; for outsourced molds and parts, through a public cloud reporting mechanism, suppliers are asked to report progress on time so the schedule can be adjusted promptly, and you always know whether the mold will meet the customer's delivery date.
IV. When a quality anomaly occurs and a part is scrapped, the procurement process needs to be triggered for purchase. Meanwhile, after the part arrives, the part's original process is automatically generated.
V. During material procurement, purchase requisition documents are automatically generated according to part classification in the design BOM [purchased-not-machined, purchased-and-machined, not-purchased-not-machined, not-purchased-but-machined], and combined with the material supply chain, the materials to be purchased are automatically pushed to a cloud RFQ procurement platform; after price comparison and negotiation, the winning supplier is determined.
VI. If a supplier's material delivery is delayed, the system automatically reminds the warehouse and purchasing to chase the materials. After materials enter the warehouse, floor material withdrawals are recorded, making it easy to trace where materials went.
VII. When problems arise during the trial run, the system provides reference solutions; at the same time, the trial-run process must also confirm whether the previous problem has been solved, and whether the current problem is due to a design change or their own mold repair; if it is a design change, the quotation process must be followed, and the processes generated are automatically counted into the engineering change cost.

Based on the actual situations encountered in mold production, dig deep into the mold process, formulate solutions, integrate systems, and keep improving — only then can a practical mold management system be developed. At the same time, combine the Internet of Things and mobile terminals to make data acquisition more convenient and user operations simpler.

Mold production management system.

After using the system, the enterprise can gain:
I. Implementation of rules:
1. In the process part, through system workflow settings, it is ensured that every person, event, time, place, and object in the factory proceeds only according to the norms, guaranteeing that executed processes follow the rules.
2. All paper forms used before the system are now handled in the system; every required field at each step must be filled in according to the norms before moving to the next step, ensuring the accuracy of form filling.
II. Costs are timely, accurate, and traceable. Know the profit and loss of every mold instantly, keeping costs under control and profits clear.
III. Rapid progress response. With automatic scheduling, progress is adjusted automatically in time; you always know whether the customer's delivery date is affected, while keeping machine utilization (load rate) at its highest.
IV. Improved overall efficiency. When an upstream step in the process is completed normally, the system promptly notifies the downstream; when anomalies occur, it also promptly notifies the relevant personnel, ensuring timely normal operations and anomaly handling, thereby improving overall efficiency.