Revolutionizing Ship Repair with Digitalization: Moges Develops an Industry-Specific Smart Management System
2026-01-26 13:02:13
The Biggest Challenges in Ship Repair: Relying on Experience, Physical Labor, and Lack of Coordination
Ship repair hasLong project cycles, complex processes, cross-job assignments involving multiple personnel, and a large variety of spare parts.These include: Traditional management models heavily rely on the experience of senior staff, often facing the following pain points:
Unplanned schedule:The progress of the ship repair project was managed using Excel or paper-based schedules, which led to delays across the entire project due to the urgent need for repairs.
Inventory buildup:Generic spare parts repeat purchase,while specialized parts are temporarily out of stock, tying up a large amount of working capital.
Difficulty in tracing quality:Welding, painting, and other critical processesLack of electronic records makes it difficult to pinpoint responsibility when problems arise.
Cost Out of Control:Labor, material, and external vendor costs.Data is scattered across different ledgers, making it impossible to perform real-time profit calculation for each vessel.
General-purpose ERP systems often "fail" due to a lack of understanding of shipbuilding repair processes. Kunshan Moges Information Technology Co., Ltd. (Moges), with 14 years of practical experience in mold and precision manufacturing, has successfully transferred discrete manufacturing management logic to the shipbuilding repair scenario, launching theIndustry-specific intelligent management system.

Understanding ship repair, and even better, understanding management: From "repairing one ship" to "managing a project"
Moges Ship Repair Solutions offer:Project ManagementCovers the entire lifecycle, from order intake and assessment to completion and settlement:
Smart Quotation and BOM:Based on historical repair data, quickly generate accurate quotes that include labor time, materials, and external vendor costs.
Multi-level WBS breakdown:Break down the entire ship repair task into segments, systems, and subsystems, clearly defining responsibilities and time points.
Dynamic Gantt Chart:Visually display parallel work plans for each department (hull, machinery, electrical), with automatic conflict alerts.
Mobile Field Reporting:Workers scan and record their working hours, upload quality inspection photos, and management has real-time visibility into progress and exceptions.
AI APS: Making complex ship repair projects "understandable and manageable"
Ship repair involves hundreds of tasks, dozens of crews, and thousands of materials, making manual scheduling virtually impossible to optimize. The Moges system is built-in.AI Advanced Planning and Scheduling (APS) Engine,achieving:
| Application Scenarios | Traditional methods | Moges AI Solution |
|---|---|---|
| Project Planning | Relies on scheduler experience, often resulting in delays. | Automatically optimize docking/undocking times to maximize port utilization. |
| Resource conflicts | Welder, crane, and other resources are in high demand. | Dynamic allocation of global resources to prevent idle time. |
| Emergency Repair | Disrupts original plans and affects other vessels. | Localized rearrangement, minimizing overall delays. |
Spare Parts Inventory: From "Warehouse" to "Precise Supply"
System SetupShip-System-PartsThree-level coding system, enabling:
Safety Stock Warning:Automatically calculates future 30-day spare parts requirements based on the repair plan, triggering purchase recommendations.
Recycling of old parts:Record and track available used parts after disassembly, prioritizing matching with new projects to reduce procurement costs.
Supplier Collaboration:Online tracking of external component progress, with automatic notifications to planners if delivery is delayed, enabling schedule adjustments.
Proven Results: Customer Case Studies Speak for Themselves
After 8 months of implementing the Moges system at a medium-sized shipbuilding yard in Jiangsu (capable of building 30+ vessels per year):
Average repair cycle per vessel reduced by 18%
Spare parts inventory turnover rate increased by 40%
The project cost accounting time has been reduced from 5 days to 2 hours.
"Now, the boss can see the profit margin for each ship on his phone, eliminating the need to 'guess' the financial results at the end of the month." – Feedback from the factory's finance manager.
Moges firmly believes: true digitalization is not simply moving offline processes to online, but rather using technology to reshape business logic. In the future, we will continue to deepen the application of AI in areas such as predictive maintenance for ship status and energy optimization, to help the Chinese shipbuilding industry move towards high-quality development.