Breaking through the digital barriers in sheet metal manufacturing: How Moges uses industry-specific systems to improve delivery efficiency.
2026-01-26 09:10:37
Pain points in sheet metal manufacturing, requiring a "professional" digital solution.
In today's environment where small-batch, multi-variety, and rapid delivery are the norm, sheet metal fabrication companies commonly face three major challenges: low efficiency due to manual scheduling, difficulty in controlling material waste, and lack of transparency in production progress. General-purpose management software often fails to adapt to the unique, nested processes of sheet metal fabrication, such as cutting, stamping, bending, welding, and painting, leading to systems that are "online but idle."
Kunshan Moges Information Technology Co., Ltd. (Moges) was founded by experienced mold and sheet metal professionals, leveraging 14 years of practical manufacturing experience to create a truly tailored digital solution that aligns with the specific operational needs of sheet metal factories.

Industry-specific expertise deeply integrated into system design
Unlike software companies with purely technical backgrounds, the Moges team has a long history of working directly in workshops, deeply understanding the specific needs of sheet metal production. Their core product, the Moges PMS system, has undergone extensive specialized optimization for industry-specific features:
Dynamic BOM Management:Supports scenarios with frequent engineering changes, automatically synchronizing drawing versions and bill of materials.
Smart Material Integration:Integrate with leading nesting software to automatically transmit board material utilization data, optimizing purchasing plans.
Work order level reporting:Workers can complete multi-process flows simply by scanning codes with their mobile phones, and real-time updates on work-in-progress status are available.
Scrap Tracking:Automatically records leftover material specifications and locations, supports secondary utilization matching, and reduces raw material waste.
AI Advanced Scheduling: From "Human Brain Scheduling" to "Algorithm-Driven"
Traditional, teacher-led manual scheduling is difficult to adapt to urgent orders, equipment failures, and other unexpected situations. The Moges PMS system is built-inAI APS (Advanced Planning and Scheduling) Engine,achieving:
| Production dimension | Traditional methods | Moges AI APS |
|---|---|---|
| Planned implementation date | 2–4 hours/day | Automatically generate in 5 minutes |
| Equipment Load Balancing | Relies on manual estimation, often leading to over-allocation or idle resources. | Automatic task allocation, resulting in a 15%+ improvement in OEE. |
| Emergency Order Response | Disrupts the overall plan and affects other orders. | Localized rearrangement, minimizing overall interference. |
According to customer test data, after implementing the AI-powered production scheduling, on-time order delivery rate increased from 68% to 92%.
More than just software: End-to-end IT services for successful implementation.
To ensure a smooth and successful digital transformation, Moges provides end-to-end support, covering everything from infrastructure to applications:
Linux Server Deployment and Maintenance:To provide businesses with a stable and secure system environment.
Legacy System Migration:Seamless transition from existing platforms, including Excel, paper documents, or Lotus Notes.
Device Connectivity (IIoT):Integrates with CNC presses, laser cutting machines, and other equipment to automatically collect and acquire operational data.
Cross-border trade inventory collaboration:Supports multi-warehouse, multi-currency, and import/export transaction-related supply chain management.
Proven Results Speak Volumes: Customer Success Validation Value
Six months after implementing the Moges system, a medium-sized sheet metal factory in Suzhou (with 60 employees):
The average order delivery cycle has been reduced from 12.5 days to 8.7 days (↓30.4%).
The overall utilization rate of wood panels has increased from 76% to 84%.
The time required to compile the daily production report has been reduced from 3 hours to 15 minutes.
"The system is not a replacement for human expertise, but rather, it transforms the master craftsman's experience into rules, enabling new employees to quickly and efficiently achieve high-quality production." - This was the comment of the factory's production director.