Customer Background: A typical "high-growth, low-efficiency" machining plant.

Suzhou Jinyi Mechanical Co., Ltd.Founded in 2010, the company specializes in high-precision, custom-made part manufacturing for the automotive, medical, and semiconductor industries. With a surge in order volume (annual revenue exceeding RMB 80,000,000), its traditional Excel + whiteboard scheduling model gradually broke down.

  • The planner spends 4 hours each day manually scheduling, but still cannot avoid equipment conflicts.

  • Progress with external factories is often tracked via phone calls; the heat treatment and surface treatment stages are frequently bottlenecks.

  • Urgent rush orders have disrupted the original plan, resulting in a monthly customer complaint rate exceeding 15%.

  • The workshop supervisor refers to himself as the "firefighter," constantly dealing with emergencies and having no time to optimize processes.

"We don't lack orders; we lack the ability to efficiently fulfill them," says Mr. Li, the company's general manager, frankly.

From

The Path to Breakthrough: Choose a Digital Partner Who Understands Your Workshop

After comparing several ERP vendors, Jinyi Machinery ultimately choseKunshan Moges Information Technology Co., Ltd.The two key reasons are:

  1. Same team background: The founder of Moges previously worked as a CNC programming engineer, possessing a deep understanding of machining logic.

  2. Lightweight solution focused on specific needs.: Instead of implementing a large, comprehensive ERP system, we focus on a "small and focused" approach.AI-powered intelligent scheduling + mobile executionFocus on core functionality, achieve rapid results.

In September 2025, the project will be officially launched, with an implementation cycle of only 6 weeks.

Three core modules, building an intelligent production command center.

1. AI APS Intelligent Scheduling Engine: From "Human Experience" to "Data-Driven"

On the first day of system launch, the planner entered all pending orders, equipment lists, and external tasks. The AI APS generated the first production schedule within 8 seconds. This schedule considers:

  • Equipment capability matching (e.g., 5-axis machine vs. 3-axis machine);

  • Material availability matching time (automatic matching of purchase order delivery schedule);

  • External vendor return date (to be filled in by the external vendor online);

  • Worker Skill Matrix (Ensure that complex tasks are assigned to experienced technicians).

"Previously, we had to manually plan each day. Now, with a single click on 'Optimize', it's done." - According to Wang, the Planning Manager.

2. Collaborative Platform for External Partners: Empower your suppliers to become your "extended workshop"

Moges has created dedicated accounts for the 12 key external manufacturing partners of Jinyu Machinery. These partners can simply log in using a mobile browser to:

  • Receive work orders and drawings;

  • Update daily progress (e.g., "Heat treatment completed, shipment scheduled for tomorrow");

  • Upload inspection report photos.

The main factory planner can see the status of external vendors in real-time within the APS system. Once a delay is detected, the system automatically triggers rescheduling.

3. Workshop Mobile Reporting: Real-time data flow within seconds.

Workers complete their time sheets by scanning a QR code using the company's WeChat app, and the system automatically records the information.

  • Task start/end time;

  • Actual working hours;

  • Reasons for anomalies (e.g., "tool wear," "drawing discrepancies").

This data is fed back to AI APS in real time, used to dynamically adjust subsequent plans, creating a "Plan-Execute-Feedback-OptimizeClosed-loop.

Significant Results: Within 3 months, from chaos to order.

As of December 2025, the system has been live for 3 months, and key indicators have been comprehensively improved:

MetricsBefore going liveAfter going liveImprovement achieved
Average planned preparation time per day4.2 hours0.4 hours↓90%
Overall Equipment Effectiveness (OEE)61%79%↑18%
On-time delivery rate72%95%↑23%
Customer complaint rate15.3%3.1%↓80%

More importantly, the production management team has shifted from a "reactive" approach to an "active planning" approach, enabling them to take on more high-value orders.

Customer Testimonials

Moges doesn't just sell software; it helps us rebuild our production management system. AI APS allows us to finally identify capacity bottlenecks and confidently commit to delivery dates to our customers.- Mr. Li, General Manager, Suzhou Jinyi Mechanical Co., Ltd.

Conclusion: Digital transformation begins with identifying pain points and achieves success through practical implementation.

A case study from Suzhou Jinyi Mechanical demonstrates that the intelligent transformation of manufacturing is not about how cutting-edge the technology is, but about whether it truly solves the most pressing problems in the workshop. Moges, with its deep industry expertise and practical product design, is becoming the preferred digital partner for an increasing number of manufacturing enterprises in the Yangtze River Delta.

Are your own businesses also experiencing similar "planning pains"? Moges offers free diagnostics and a trial period to help you take the first step towards intelligent upgrades.