A New Paradigm for Non-Standard Machine Processing Performance Management: A Detailed Explanation of Moges' "Estimated Hours + Actual Hours" Dual Incentive Model
2026-03-10 08:46:26
The performance challenges of non-standard machine processing: Why traditional methods fail?
In the field of non-standard machine processing – encompassing customized equipment components, specialized tooling, test samples, and spare parts – each task is essentially a "one-off" project. The drawings, materials, and processes are highly differentiated, leading to the failure of traditional performance management methods.
Unit-based system failure: Due to the absence of duplicate items, it is impossible to set a unified price.
Rigid daily wage system: Experienced employees are highly efficient but lack financial incentives, while new employees require time to develop but still incur full labor costs.
No basis for allocation.: Frequent disputes regarding end-of-month performance are causing damage to team morale.
Difficult to measure human efficiency.: Companies are unable to accurately calculate actual labor output, leading to passive cost control.
The root cause lies in: the lack of a system that is specifically tailored to...Single-piece, small batch, and high-variabilityPerformance mechanism for production characteristics.

Moges' innovative solution: A dual-track model of "Estimated Hours + Actual Hours"
With a decade of deep expertise in digitalizing machine processing, Kunshan Moges Information Technology Co., Ltd. proposes to...Task ValueIntroducing the core performance paradigm – the "Estimated Work Hours x Actual Work Hours" intelligent performance model. This solution doesn't rely on quantity-based metrics, but instead focuses onEfficiency and Technological ValueFor benchmarking purposes.
1. Define dual-shift working hours
Estimated Working Time (Standard Time): Determined by the operator or experienced technician during job assignment, based on factors such as part complexity, material properties (e.g., titanium alloy, stainless steel), number of processes, and difficulty of assembly, to set a "reasonable processing time." This is a time frame that the company recognizes.Labor Value Benchmark.
Actual Working Time: The system automatically records the actual time spent by employees from start to completion, serving asEvaluation criteriaHowever, it does not directly affect salaries.
2. Performance Settlement Rules: Fair and Incentive-Based
Regardless of the actual duration of use, employee performance is measured based onEstimated working hoursFull calculation. This design achieves two key benefits:
Benefit from efficiency.: Achieve faster task completion and significantly increased revenue per unit of time.
Incentives for those with low efficiency: While not penalized, employees cannot increase their income by working longer hours, which naturally creates motivation for skill development.
Typical Scenario Example:
Customized single product for customerTitanium alloy custom-shaped supports(Single piece), thin-walled structure, prone to vibration, requires 5-axis machining.
Estimated processing time = 4.0 hours
Employee A (Experienced): Optimize cutting parameters,2.8 hoursComplete → Take 4.0 hoursPerformance
Employee B (New): Exercise caution, as the process takes time.5.2 hours → Still using 4.0 hoursPerformance
Results: The technical value is highlighted, highly skilled employees are more willing to take on complex tasks, and the team's skill structure is optimized.
Effortless Implementation: Scan and use immediately, zero-interference production flow.
Non-standard tasks require a tight schedule, and the system must be "lightweight and unobtrusive." Moges utilizes aIndustrial PDA + 2D Barcode ReaderSimplified Mode:
Before the shift, the team leader will connect the PDA.Operator + Equipment;
Employee start: Scan a work order code → The system automatically starts the timer;
Completion Reporting: Scan the same work order code again → System stops timing and generates performance data.
The system compares estimated vs. actual values in the backend and generates detailed reports.
✅ No quantity or time input is required throughout the process (for non-standard parts, completion is typically for single units).
✅ Does not require a mobile device, complying with workshop explosion protection and management regulations.
✅ Both experienced technicians and new employees can quickly get up to speed and seamlessly integrate into the single-piece production flow within just 3 minutes.
Data-driven: Build a customized, non-standard work hour knowledge base for your enterprise.
Although each part is new, the manufacturing characteristics have reusability. The Moges system continuously accumulates three types of core data:
Distribution of processing efficiency for different materials (aluminum alloy, stainless steel, titanium alloy, etc.);
Typical processing time ranges for standard parts (including irregular shapes, thin-walled parts, and parts with deep cavities).
Employee skill profiles and career progression paths for specific process types.
Based on historical data, the system can provide support for new tasks.Suggested time range estimate, Assist in process decision-making, Gradually reduce reliance on individual“Expert”Dependency on, Digitally preserve and transfer accumulated experience.
Customer Validation: Improved efficiency, more stable team.
After a high-end equipment support company (with 90% of its business being non-standard test fixtures) implemented Moges, it achieved significant improvements:
| Metrics | Improved results |
|---|---|
| Critical single-unit delivery cycle | Average reduction 18% |
| Willingness to undertake complex tasks | Encourage and motivate existing employees to take on leadership roles. 70% |
| New employee onboarding period | Reduce 30%(Refer to estimated working hours for similar tasks) |
| Performance dispute events | Resetting to baseline, core technician attrition rate decreases. 45% |
Why Choose Moges?
Focus on machining: Instead of a general ERP system, we focus exclusively on the MES execution layer, with a deep understanding of workshops and operators.
Support for non-standard configurations: Designed specifically for single-piece/low-volume scenarios, rejecting the application of "batch thinking."
Cost-effective implementation: Scan-based mode, zero equipment modification, immediate deployment, and results visible the next day.
Flexible Scalability: Future-proof your factory with the ability to easily integrate CNC signals and IoT sensors on demand, enabling a seamless transition to a smart factory.
Instantly launch efficient and fair non-standard performance management.
If you are facing challenges such as difficulty in calculating non-standard processing performance, weak incentives, and low efficiency, the Moges production management system can provide you with a comprehensive solution.Practical, implementable, and high-return.Our comprehensive solution.
Please contact our consulting team to obtain the "Non-Standard Machine Processing Performance Management Implementation Guide" or to schedule a system demonstration.
Note:: This solution is suitable for machine processing companies that primarily operate with customized, single-piece, and small-batch production. The system supports on-demand expansion of modules for device monitoring, quality traceability, and cost accounting, creating an integrated digital workshop.
Moges (Moges) – Dedicated to digitalizing machining for twelve years, ensuring that the value of every single machining process is accurately measured and fairly rewarded.