The boss asked which mold system is profitable, and I need to calculate it for half a month. How can I perform real-time and accurate cost accounting for a mold factory? | Moges Cost Management

2026-04-23 12:19:31

Introduction: The challenges faced by Wang Financial in Wenzhou.

A financial manager at a mold factory in Wenquan, Leqing, recently encountered a problem.

This is a significant issue, neither too big nor too small, but it occurs every day, resulting in wasted time and money, which is a major headache for him.

This issue is not solely the responsibility of one individual; it is a shared pain point experienced by countless mold factories.

The boss asked: "Which of the sets of molds we produced last month were profitable, and which were not?"

Mr. Wang needs half a month to process all the documents. Once he finishes, the boss is already impatient, and the project has already been completed.

This isn't a matter of ability; it's a system issue. Even the most skilled finance professionals are helpless without a robust cost accounting system.

The boss asked which mold system is profitable, and I need to calculate it for half a month. How can I perform real-time and accurate cost accounting for a mold factory? | Moges Cost Management

I. Three major financial pain points for mold factories

For those in finance, who doesn't have a mountain of complaints? Every day is filled with busy work, and problems keep arising, while you always end up taking the blame, and the credit always goes to others.

It's not a matter of your individual capabilities; the industry is simply too traditional. There's an over-reliance on manual processes, experience, and personal connections. The lack of standardization, systematization, and data-driven decision-making makes it impossible for even the most capable individuals to manage everything effectively within a 24-hour workday.

Let's take a look at some of the most challenging financial tasks:

Pain Point 1: Lack of transparency, requiring constant questioning to obtain information.

Has the material been purchased? When will it arrive? Has the specific process been completed? Why was it stopped? Have the customer's mold modifications been communicated to production? I need to ask about everything, constantly calling, but I still don't understand the situation.

Specific examples:

  • Lack of transparency in procurement information:Are materials not yet ordered? Have suppliers not shipped? When will they arrive? You need to call purchasing to inquire.

  • Lack of production information transparency:Has the operation been completed? What stage has it reached? Why was it stopped? It is necessary to go to the workshop to ask production.

  • Lack of transparency regarding external information:Have you sent the request to the external vendor? What stage have they reached? When can we expect a response? Please call the external vendor to inquire.

  • Lack of design information transparency:Have the designs been revised? If so, what changes were made? Have the revised designs been transmitted to production? All of these questions should be directed to the design team.

From morning till night, I'm constantly on the phone, but I still can't get a clear understanding of everything. The lack of transparency, high communication costs, low efficiency, and frequent errors are a major problem.

Pain Point 2: Lack of record-keeping, making it impossible to identify responsibility when problems arise.

Something is missing. Who took it? When did they take it? Where did they take it? No one knows. When did the quality issue occur? Who was responsible? What parameters were used? It's a situation of "one question, three unknowns," ultimately leading to no resolution. This will continue to happen in the future.

Specific examples:

  • Material usage without record:Is material inventory management being used? Who is responsible for managing it? How much material is being managed? Which ERP/MES system is being used? Currently, everything is manually recorded, leading to frequent errors and omissions.

  • Inaccurate time tracking:How much time was spent? Who performed the work? When was it performed? All recorded through manual reporting; workers report the time spent as they see fit.

  • Quality issues have no traceability:When quality issues arise, who is responsible? When did the issue occur? What parameters were used? The answers are always vague and eventually disappear.

  • Incomplete mold records:What changes were made during the redesign? Who made those changes? When were the changes made? How many working hours were involved? All changes were communicated verbally, and over time, the information became distorted.

No records are maintained, making it impossible to identify responsible parties when problems arise. Departments pass the blame to each other, leading to recurring issues and escalating costs.

Pain Point 3: All experience resides in individual employees' minds, and when those employees leave, that experience goes with them.

Experienced employees know exactly where to find things and how to handle various issues. They also know how to deal with different suppliers. When experienced employees leave, this knowledge goes with them, and new employees have to start from scratch, making mistakes repeatedly, and the company has to pay the price for their learning.

Specific examples:

  • Material storage based on memory:Knowing where to find everything is only known by the experienced warehouse staff. When new staff members join, they often spend half a day trying to locate items.

  • Problem resolution relies on experience:What problems arise and how to resolve them? This information is only known by experienced employees. New employees often find themselves unsure of how to handle problems when they arise.

  • Supplier Management Based on Relationships:The process of interacting with suppliers, only known by experienced buyers, needs to be re-established when new buyers join.

  • Cost accounting based on intuition:The cost of each mold is known only to the senior finance team; new finance personnel will need to investigate this independently.

All the experience resides in individual minds, and when those individuals leave, the experience goes with them. The company lacks accumulated knowledge and remains stuck in place.

Two, using a system to manage costs is completely different from using people to manage costs.

Many business owners feel that these are minor issues that will resolve themselves over time, and that investing in a system is unnecessary. Alternatively, they believe that implementing a system actually creates more problems, requiring personnel to operate it, making it a poor investment.

These are all completely incorrect assumptions. Managing with a system is fundamentally different from managing with people, and the efficiency difference is at least ten times greater.

Difference 1: Different methods for obtaining information

With siloed information scattered across individual employees' minds, obtaining the necessary information requires constant questioning, communication, and negotiation.

To find out if materials have arrived, I would have to call the purchasing department. To find out if a process is complete, I would have to go to the factory and ask the production team. To find out what stage the external contractor is at, I would have to call them. Throughout the day, I would be constantly on the phone, but I still couldn't get a clear picture of everything.

With System Guan, information is centralized. All data is stored within the system, making it readily accessible. You don't need to ask anyone; everything is clear at a glance.

Want to know if materials have arrived, whether orders have been placed, whether suppliers have shipped, and when they are expected to arrive; want to know if processes are complete, and see who is working on them, how much has been completed, and when they will be finished; want to know the progress of outsourced work, and see if outsourcing reports have been submitted, what steps have been completed, and when they will be returned.

With increased transparency, communication costs are reduced, and efficiency naturally improves.

Difference 2: Different recording methods

Manual data entry: The accuracy depends on the operator. If the operator wants to record the data accurately, they can do so. If they choose not to, the data will be inaccurate. The system does not verify the accuracy of the data entered.

Material usage is tracked through manual registration, work hours are recorded through work orders, and quality issues are reported through forms. There is no standardized system, so employees can choose to record information or not, and there is no way to verify the accuracy of the data. When problems arise, it is difficult to determine the root cause, and issues often remain unresolved.

With System Guan, records are automatically generated, clearly showing who performed the task, when it was performed, and what was done. These records cannot be altered or deleted, ensuring complete and accurate traceability.

Material usage scanning and registration, time recording scanning and reporting, quality issue system recording. Who did it, when it was done, and what was done, all clearly recorded. It's impossible to change or ignore. When a problem occurs, you can immediately see who is responsible, without departments passing the blame to each other or ignoring the issue.

The process leaves a clear trace, which clarifies responsibility, and prevents the problem from recurring.

Difference 3: Different approaches to knowledge transfer.

With Moges, experience is managed, and experience is personal. When an employee leaves, their experience is lost.

Experienced employees know exactly where to find things and how to handle various issues. They also know how to deal with different suppliers. When experienced employees leave, this knowledge goes with them, and new employees have to start from scratch, making mistakes repeatedly, and the company has to pay the price for their learning.

With System Guan, the experience is embedded within the system, making it readily available to everyone. New employees can quickly get up to speed by reviewing the historical records within the system.

All questions, all solutions, and all best practices are stored within the system, forming the company's knowledge base. New employees can quickly get up to speed by reviewing the system's historical records and seeing how similar problems were previously resolved. Experienced employees can leave the company without taking their knowledge with them.

With accumulated experience, the company builds a solid foundation, which allows for continuous improvement and prevents significant fluctuations due to personnel changes.

3. How Moges helps you solve cost accounting problems

Moges has 14 years of experience in mold MES solutions, specifically designed to address the pain points of mold factories. We don't offer a large, all-encompassing system. Instead, we start by tackling the most critical issues faced by mold factories, solving them one by one, so you can see tangible results.

Solution 1: Full-process digitalization, with all information within the system.

The entire process, from order, design, programming, machining, assembly, prototyping, outsourcing, procurement, receiving, and delivery, runs entirely within the system. All information is contained within the system, eliminating the need to ask around or search for information. You can simply open the system to find what you need.

Specific Implementation:

  1. Order Management:When a customer places an order, the system automatically generates a project, assigns a project number, sets a delivery date and budget.

  2. Design Management:Design drawings, BOM, and process routes are all stored within the system, along with version management and change logs.

  3. Programming Management:Programming tasks, tool lists, and machining parameters are all stored within the system and linked to the design drawings.

  4. Manufacturing Management:Work order scheduling, equipment allocation, and time recording are all managed within the system, with real-time updates upon scanning.

  5. Assembly Management:Assembly tasks, parts lists, and assembly records are all contained within the system, and are linked to processing records.

  6. Prototype Management:The prototype plan, prototype report, and issue records are all stored within the system and linked to the assembly records.

  7. External Management:All external tasks, external vendors, and external progress are tracked within the system. Scan to report progress, with real-time updates.

  8. Procurement Management:All purchase orders, supplier information, and delivery records are stored within the system and linked to material requirements.

  9. Receiving Management:Material receiving, finished goods receiving, and inventory counting are all performed within the system, with barcode scanning and real-time updates.

  10. Delivery Management:Delivery plans, delivery records, and customer sign-off are all tracked within the system and linked to specific projects.

End-to-end digitalization: All information is within the system, eliminating the need to call to inquire about the status of purchased materials or ask about the completion of processes in the workshop. No longer need to flip through records to find out how the last mold change was made. Open the system and see everything at a glance.

Solution Two: Comprehensive Traceability: Every action, by whom, is clearly documented.

Every operation within the system is recorded, including who initiated it, who approved it, the date and time it was performed, the actions taken, and the resulting outcome. All of this information is recorded with timestamps, and cannot be altered by anyone.

Specific Implementation:

  1. Operation Log:The system automatically records every operation, including the operator, operation time, operation content, and operation result.

  2. Approval Process:Key operations require approval, with the approver, approval time, and approval comments all recorded.

  3. Version Management:Design drawings, process documents, and other materials have version control, with each modification recorded and traceable.

  4. Change Log:Project changes, design changes, and process changes, among others, are all tracked, including the reason for the change, the content of the change, the person responsible for the change, and the date of the change.

  5. Problem Log:Record any quality issues, equipment issues, and material issues, including the description of the problem, the cause of the problem, the solution, the responsible person, and the completion time.

Complete traceability: Every action is clearly recorded. When problems arise, you can immediately identify who is responsible, eliminating the need for departments to pass the blame. Problems are solved, and responsibility is taken. This ensures that mistakes are not repeated.

Solution Three: Leverage Accumulated Experience, Transforming Personal Expertise into Company Assets

All questions, all solutions, and all best practices are fully captured within the system, forming the company's knowledge base.

Specific Implementation:

  1. FAQ:Frequently Asked Questions List, including problem descriptions, problem causes, and solutions.

  2. Case Studies:Typical problem case examples, including problem background, problem analysis, solutions, and implementation results.

  3. Standard Library:Quality standards, process standards, operating standards, etc.

  4. Training Library:Training materials, training videos, and training practice questions.

  5. Supplier Database:Supplier information, supplier ratings, and supplier collaboration records, etc.

  6. Customer Database:Customer information, customer requirements, and customer collaboration records.

As experience accumulates, the company builds up a valuable knowledge base. New employees can quickly get up to speed by reviewing the system's historical records and seeing how similar problems were previously resolved, rather than relying on individual mentors. When experienced employees leave, their knowledge and expertise remain within the company, ensuring continuity.

4. Implementing the system is not about spending money, but about making an investment.

Waste 1: Material Waste

A copper foundry failed to locate a specific material, resulting in a need to reorder, costing several thousand dollars. The lack of material usage records led to over-ordering, with no one monitoring the usage, resulting in over 100,000 dollars in material waste annually.

Waste 2: Time Waste

Inaccurate time tracking: record the actual time spent, and report accordingly. With a year of inaccurate time tracking, tens of thousands of hours are wasted. Improper process scheduling: leads to equipment downtime, resulting in tens of thousands of hours of wasted time per year.

Waste 3: Quality Issues

A single design issue that wasn't documented resulted in a similar problem the next time, costing tens of thousands of dollars to correct. Quality issues without traceability made it impossible to identify the root cause, leading to repeated problems. Over a year, these quality issues resulted in losses of hundreds of thousands of dollars.

Waste 4: Loss of Experience

A long-term employee left, taking years of experience with them. New employees had to learn everything from scratch, repeatedly making mistakes, and the company had to pay for their training over and over again. Over the course of a year, the company lost tens of thousands of dollars due to the loss of experience.

Return on Investment

Implementing the system is not an expense, but an investment that will save you money and help you make more money.

We have a customer who, after implementing the Moges system, saved over 500,000 in a single year due to reduced waste and increased efficiency. This resulted in a significant return on investment, exceeding the cost of the system itself.

The owner said, "If I had known the results would be this good, I would have implemented it much earlier. The money I wasted could have easily purchased several systems."

V. Financial advice for mold factories

As the finance manager for a mold factory, you're constantly struggling with cost accounting. However, you should know that this isn't your problem; it's a problem with the system. Even the most skilled finance professionals are helpless without a good cost accounting system.

Suggestion 1: Drive Digital Transformation

You should proactively communicate with your boss, explaining the pain points of cost accounting, the necessity of implementing the system, and the return on investment. Make it clear to your boss that implementing the system is an investment, not just an expense, and that it will ultimately save him money and generate profits.

Suggestion 2: Choose a supplier with industry expertise.

When choosing an MES supplier, don't just focus on price. Consider these three key factors: First, does the supplier understand the mold industry? Second, is the implementation team experienced and professional? Third, does the supplier provide adequate after-sales service? Cheap solutions may seem appealing initially, but they often lead to frustration and problems in the long run.

Suggestion 3: Participate in the system implementation.

During the system implementation process, it is important to actively participate, express your needs, and offer your suggestions. The system is designed to serve you, and you should ensure that it aligns with your work habits and workflows.

Suggestion 4: Let the data speak for itself.

After the system goes live, you need to demonstrate its effectiveness using data. For example, the time required for cost accounting has been reduced from one month to one day, the accuracy of cost accounting has increased from 60% to 95%, material waste has been reduced by 30%, wasted working hours have been reduced by 20%, and quality issues have been reduced by 50%. Use data to prove that implementing the system is worthwhile.

Conclusion: Digitalization is the inevitable path for the mold industry.

Despite the significant advancements in mold manufacturing over the past decades, including increasingly sophisticated equipment and more advanced technologies, management practices remain largely unchanged, relying on manual oversight, experience-based decision-making, and direct supervision by management.

This management approach works well for small factories, but becomes unmanageable as the business grows. Problems and inefficiencies increase, leading to lower productivity and rising costs.

Digitalization is an inevitable path, not a matter of choice. If you don't adopt it, you will be eliminated. The sooner you adopt it, the sooner you will benefit. By establishing standardized management practices, improving efficiency, and reducing costs, you can survive and thrive in increasingly fierce competition.

Moges has been developing mold MES solutions for 14 years, serving over 200 small and medium-sized mold factories. We have the deepest understanding of the pain points of these types of businesses and know exactly how to address them.

Remember, implementing the system is an investment, not an expense. The return on investment is typically between 6 and 12 months, and the money saved in a year can afford several systems.

« Back to News list