Can't make a profit from custom projects? Try using a custom project cost accounting software to accurately calculate every penny.

2026-05-20 08:04:10

Revenue in the tens of millions, but low profits? The core issue is that costs are not being accurately calculated.

I have spoken with many owners of companies specializing in custom molds and precision machining. During their annual financial reviews, they consistently face the same challenges: despite completing dozens of projects each year, generating revenue in the tens of millions, and deducting rent, salaries, and raw materials, their profits are no better than the annual salary of a senior engineer. They struggle to determine which projects are profitable and which are losses, relying on post-financial accounting to piece together the information. No one can clearly explain where the losses occur.

Even though non-standard projects may seem to have high value, why do they often fail to generate significant profits?The core issue is that costs were not calculated correctly.

Can't make a profit from custom projects? Try using a custom project cost accounting software to accurately calculate every penny.

Non-standard project costs are often chaotic, and many small and medium-sized enterprises (SMEs) suffer due to these details.

Customized manufacturing is inherently project-based, with no standardized products. This makes cost accounting more complex than mass production. Many factories are still using outdated methods, and it's a wonder they're still functioning. Common pitfalls include:

Cost anomaliesSpecific examplesDirect consequences
Raw material allocation is disorganized.Multi-piece material cutting, and secondary utilization of scrap materials, simple and efficient cost calculation based on production value.Small orders with multiple products result in losses, while large orders with fewer products result in gains. A project with a value of 1 million RMB resulted in a loss of 8 points before discovery.
Manual labor hours are not accurate.Work on three to four projects interspersed throughout the day, and estimate working hours at the end of the month based on memory.Actual consumption takes 3 days, but reporting is done in 1 day, resulting in a 15%-20% difference in labor costs.
External vendor cost consolidation orderThe reconciliation process takes two to three months, and the finance department simply assigns the invoices to the most recent project.The cost of Project A was allocated to Project B, and upon completion, it was discovered that the profit was already negative.

Don't try to make do with Excel; avoiding the pitfalls of non-standard cost accounting is essential.

Many business owners believe that cost accounting is simply a matter of adding and subtracting, and that Excel can handle it. However, once they actually use it, they quickly realize that Excel is inadequate for small workshops with a few orders. When the volume of orders increases, three critical problems arise:

  • Data synchronization issues:Production progress changes daily, and we had seven or eight Excel versions, but no one could determine which one was correct, resulting in inaccurate cost calculations.

  • Unable to isolate single operations:The system can only calculate the total project cost, making it impossible to determine whether each process is profitable. It's impossible to decide whether to invest in in-house equipment or outsource, as there is no clear way to determine the best option.

  • Hidden costs are not factored in:Only consider raw materials and direct labor costs. Management expenses, equipment depreciation, and utilities are not allocated. The book gross profit is 18%, but the actual gross profit is only 9%.

A useful non-standard project cost accounting software must meet these four key requirements.

Many management software solutions currently available claim to be able to perform cost accounting, but most are either too comprehensive for small businesses or fail to adapt to the logic of batch production and non-standardized manufacturing. To make the right choice, consider these key criteria:

Standard 1: Must be a single-project aggregation logic for non-standard projects.

Starting from raw material consumption, every expense can be linked to a specific project, and scrap utilization can be automatically split and deducted. For factories using a mold + machine processing hybrid mode, it should also supportDual-mode architectureSeparate cost accounting for non-standard projects and batch production, preventing interference between the two.

Standard Two: Data collection should be simple, and operators must be willing to use it to ensure accurate data.

The ideal software should support:Scan to record workWorkers can quickly scan project codes and process codes, and simply tap to clock in and out, automatically collecting working hours for the corresponding project. With no need for extensive training, users can easily get started, resulting in improved data accuracy.

Standard Three: External contractor costs can be automatically associated with projects.

When sending to external vendors, always include the project number. Upon receiving and verifying the work, all costs are automatically allocated to the corresponding project, eliminating the risk of incorrect or duplicated invoices. This also eliminates the need to manually review large amounts of paper invoices for reconciliation.

Standard Four: Automatically allocate hidden overhead costs.

Supports allocating costs, equipment depreciation, and utility consumption (electricity, water) across different methods, such as by working hours and production value. The resulting profit is calculated after deducting all costs.Real ProfitThis refers to actual, tangible profit, not just accounting profit.

Now that you have accurate cost data, what changes can it bring to your factory?

Many business owners believe that cost accounting is simply a financial process, but accurately calculating costs is the foundation for all factory decisions. I have seen too many factories that, due to inaccurate cost calculations, continued to accept unprofitable orders, believing that their business was doing well.

Kunshan Moges has been specializing in management systems for the precision mold manufacturing industry since 2008. With over 200 customers, 95% are able to implement cost accounting within 3 months. A particularly notable example is a mixed-mode factory with an annual output of 200 million, where, after implementation, all non-standard molds, from materials, labor, and sub-contracting costs to expense allocation, are clearly listed. The owner was able to eliminate 12% of low-margin projects with less than 5% profit, freeing up capacity to take on high-margin precision mold orders.The profit margin increased by nearly 20% that year.

Furthermore, after calculating the cost of individual work orders for certain factories, it was discovered that their equipment utilization was underutilized. When depreciation was included, the cost was 10% lower than outsourcing. By transferring some work orders back in-house, the factories saved tens of thousands of dollars per year.

Conclusion: Profit or loss is not determined by feeling, but by calculation.

Simply put, whether you make a profit or not on non-standard projects depends on calculation, not intuition. If you can accurately calculate the cost of every project and every process, you will have a significant advantage over 90% of your competitors who cannot.

Many people say that the non-standard industry is difficult and has low profits. In reality, a large portion of the profits are lost due to "inability to accurately account for costs": not knowing whether a loss-making order or a profitable order was completed, and mistakenly believing that profits cannot be made. After so long working on non-standard projects, have you ever experienced a situation where you worked hard for a year and only realized that you didn't make a profit?

« Back to News list