Don't start with a large platform: After implementing the automated equipment production management system in over 200 factories, I see the real problems.
2026-06-06 08:01:21
Introduction: Before deciding whether to implement a system in your factory, first review these three key metrics.
To determine if a factory is a good fit for the system, you don't need to look at presentations first. Just look at these three key metrics: How many times projects are delayed, how many times there are disputes with external vendors, and how much profit each machine generates. Kunshan Moges Information Technology Co., Ltd. has implemented the system in over 200 factories, maintaining a success rate of over 95% and a renewal rate exceeding 90%. This provides a very realistic conclusion:Truly effective, implementable automation equipment MES systems are often not the ones with the most features, but rather those that effectively manage a few key on-site processes.
The manufacturing of automated equipment and standard parts differs significantly. Many companies specialize in non-standard equipment, tooling, modules, and fixtures, operating on a project-based order system. Design revisions, procurement follow-ups, machine processing add-ons, assembly, debugging, and rework – any single stage that falls behind will delay the entire project. The owner constantly asks about progress, and the production manager relies on WeChat group messages. Ultimately, everyone is busy, but the information remains inaccurate.

Step 1: First, address the issue of "invisibility," and then discuss optimization.
Many automation equipment manufacturers initially aim to integrate ERP, PLM, WMS, device networking, and large-screen dashboards into a single system. While this approach is valid, it carries significant risks for small and medium-sized factories with annual sales ranging from 10 million to 50 million. The biggest concerns for these factories are not the lack of advanced system capabilities, but rather the absence of properly established basic data, resistance from on-site personnel, and excessively long implementation cycles.
For the first phase of automation equipment MES, the production site should initially be "visible." This means knowing the status of each piece of equipment or set of tools: which processes a part has undergone, which parts are outsourced, which parts have returned to the factory, what components are missing, and where the debugging is taking place. If this information still relies on manual inquiries, management will inevitably become inaccurate.
A practical approach is to first focus on these key areas:
Full-process production progress tracking:For each project, each piece of equipment, and each critical component, the system allows you to track exactly where each step is in the process. You no longer need to rely on supervisors to remember the details. For example, if a machine's frame is currently being welded, the control system is programmed, and an outsourced component is expected to return to the factory tomorrow, all of this information is readily available.
Work order scanning for payroll:Line workers can simply scan a code to record their work, reducing the need for manual daily reports and post-recording, which significantly reduces on-site resistance. After completing a work step, the employee scans the work order QR code and clicks "Complete," and the system automatically records the time and personnel.
Complete external process management:How many were shipped, how many were returned, were any overdue, and do the reconciliation amounts match? This cannot be solely based on confirming with the purchasing department and external manufacturing facilities by phone. From the initial shipment, link the project and parts together. Use the same record for returning, inspection, receiving, and reconciliation.
Mobile device view:Even when the boss is not on-site, key project progress can be viewed, eliminating the need to constantly ask questions in the group daily. With a mobile device, you can see: Project A is 80% complete, external parts for Project B, and debugging for Project C.
While these features may seem straightforward, they are crucial for manufacturers of automated equipment. The difficulty lies in managing non-standard projects, not in any single process being particularly complex, but rather in the sheer number of information gaps. The more gaps there are, the more likely a plan becomes useless.
Step 2: Don't make your automation equipment MES a "spreadsheet warehouse"
Many factories fail during their initial implementation of the system not because the software lacks functionality, but because they treat the system as an electronic spreadsheet repository. They attempt to manage procurement, production, and finance in separate systems, leading to data conflicts. On-site employees find the system increases their workload, supervisors find the data unreliable, and management stops reviewing reports after seeing them twice.
There's a common misconception that needs to be clarified:MES is not about simply moving paper-based processes to a computer; instead, it focuses on redefining which data needs to be generated on-site.
Key data should be generated in the following way:
Process completion time:Generated from on-site scanning and reporting, not based on end-of-month recall and filling.
External vendor return time:Confirmation should be made during the receiving or inspection process, not through a phone call from the purchasing department.
Quality Issue Record:Instead of being written on paper inspection forms, the information is linked to specific projects, parts, and processes.
Material Consumption:Linked to work orders, so you don't have to discover usage at the end of the month.
Manufacturers of automated equipment frequently experience design changes and temporary orders. If the system only operates according to a fixed route, it will quickly be bypassed in the field. Therefore, when selecting an MES system for automated equipment, it is important to consider whether it is suitable for project-based management and whether it can accommodate both batch processing and machining operations. Many companies handle both custom equipment projects and parts manufacturing, with small-batch production. If the system can only manage one type of operation, management gaps will inevitably arise.
Step 3: Cost accounting is not about end-of-month financial accounting, but about project process control.
The most easily overlooked aspect for manufacturers is determining the actual profit margin for each piece of equipment. While the initial quote may appear profitable, after project completion, it's discovered that processing costs, outsourcing costs, and rework consume a significant amount of time, ultimately resulting in a loss of profit when the monthly financial report is compiled.
The cost-value of automated equipment MES is not just generating a cost report, but breaking down costs into the project process. Materials, processing time, external service fees, rework records, and quality issues should all be associated with specific projects. This allows the boss to see not just "how much profit this month," but to clearly identify which types of projects are profitable, which processes are prone to overspending, and which external service stages frequently cause delays.
Project cost accounting should include:
| Cost Type | Statistical methods | Management Value |
|---|---|---|
| Material Costs | Purchase order project, material requisition and work order. | Know exactly how much material is used for each project. |
| Labor Costs | Work order scanning for payroll, calculated based on personnel costs. | Know the specific labor costs associated with design, machining, assembly, and debugging. |
| External costs | Complete end-to-end outsourcing project | Identify which project the external expenses are allocated to, and determine the repair cost. |
| Unexpected Costs | Quality issues, rework, and scrap records. | Understand why projects are over budget and identify potential problem areas. |
For small and medium-sized automated equipment manufacturers, accurate cost accounting has a very direct significance: future quotes will no longer rely solely on experience, and project reviews will no longer solely focus on blaming individuals. The system captures process data, preventing experience from remaining only in the minds of a few senior technicians and project managers.
Step 4: Quality traceability should focus on closing the loop for issues, not just for customer audits.
After automated equipment is delivered, customers are most concerned about the repeated repair and maintenance required during the on-site commissioning phase. When problems arise, if the only options are to review chat logs, ask the assembly technicians, or examine paper inspection records, the efficiency will be very low. Poor quality traceability ultimately leads to disputes, with the loudest voice prevailing.
Quality traceability within automated equipment MES focuses on the ability to trace back to specific projects, parts, processes, and responsible parties, rather than simply creating aesthetically pleasing forms. For example, if a machining dimension is out of specification, is it due to a problem with the drawing version, the machining process, or an external subcontractor? Only by being able to trace the root cause can valuable insights and experience be derived.
The information chain that should be included in quality traceability:
Problem Identification:Which project, which part, which operation, and when was the problem discovered?
Problem Description:What specific issues are you facing? Please provide photos, videos, and data records.
Traceability:Is the issue related to design, manufacturing, outsourcing, assembly, or inspection?
Action Plan:How to handle it, who is responsible, and how much time it takes.
Proven Expertise:How to avoid these issues in the future? Design improvements, process optimization, or supplier management?
Currently, some systems present AI in a very abstract way. My perspective is more direct: AI is not a panacea, but completely avoiding it will lead to falling behind. For automation equipment manufacturers, AI is most suitable for specific applications such as intelligent scheduling and quality alerts. For example, AI can assist in scheduling based on project processes, resource utilization, and anomaly records, or provide early warnings about quality risks. Don't immediately assume that the system will handle all decision-making; on-site management still requires human responsibility.
Step 5: Three parts are software, seven parts are implementation. This statement is particularly evident in automated equipment factories.
Even with the same automated equipment MES system, some factories can get it up and running in three months, while others are still working on basic data entry after six months. The difference often lies not in the software interface, but in the implementation method.
A more stable implementation approach is to pilot the system before a full rollout. Instead of implementing all modules at once, start with a single workshop, a specific project type, or a typical process. This involves establishing the basic data, workflow, scanning and reporting, and outsourcing management. Then, gradually expand the system. This approach allows for the timely identification of on-site issues and provides management with a clear view of the actual results.
Moges' Five-Step Implementation Method:
Phase 1: Basic Data Preparation (1-2 weeks)
Establish project numbering rules, material coding, work process library, and personnel information to ensure data accuracy.Stage 2: Core Process Pilot (2-4 weeks)
Select 1-2 typical projects to implement the three core processes: progress tracking, barcode-based work order, and external vendor management.Third Phase: Problem Optimization and Adjustment (1-2 weeks)
Optimize processes based on pilot results, address issues raised during on-site feedback, and train key users.Stage 4: Full-Scale Promotion (4-6 weeks)
Gradually expand to all projects and all workshops, establishing daily maintenance mechanisms.Stage 5: Deepen Application (Ongoing)
Leverage foundational data for in-depth applications such as cost analysis, quality traceability, and performance assessment.
Here's a key takeaway:80% of management issues can often be solved by addressing the core functionality with just 20% of the features.Small and medium-sized factories should not immediately pursue comprehensive, large-scale ERP/MES solutions. Instead, focus on mastering the core functions of progress tracking, work reporting, outsourcing management, cost control, and quality management first. Then, explore more advanced features.
Another crucial point is that the system implementation should be driven by the project manager. The project manager should be involved from the initial contract signing and remain actively involved throughout the implementation. If the project manager is not involved, the probability of failure will be very high. This is because the MES system requires coordination between production, procurement, outsourcing, quality, and finance, and without the project manager's support, there is a risk that different departments will work independently.
Step 6: When selecting an automated equipment MES, consider both the architecture and the industry-specific requirements.
System stability is crucial in a manufacturing environment. Daily tasks such as production reporting, outsourcing, and progress tracking require a reliable system. Frequent crashes, malware infections, and complex maintenance can quickly lead to frustration and inefficiency. The native Linux architecture offers advantages in stability, security, and performance, making it a more user-friendly solution for long-term factory use.
However, the architecture is just the foundation; what's more important is whether the vendor understands the industry. Many pain points of automation equipment manufacturers are very similar to those of mold and precision machining companies: projects are clearly defined, there are many processes, outsourcing is common, variability is high, and there is significant pressure to meet deadlines. If the implementation team only understands general software, but doesn't understand machining processes, doesn't understand outsourcing reconciliation, and doesn't understand project delivery rhythms, the solution is likely to remain superficial.
When selecting, it is recommended to ask the following specific questions:
Project Progress Management:Can you clearly track the progress of a non-standard device, from initial approval to processing, outsourcing, assembly, and testing, based on project milestones?
Mixed Mode Support:Can a single system manage both small-batch machining production and project-based equipment delivery?
Ease of Use in the Field:Is it simple enough for on-site employees to submit their timesheets, and can scanning barcodes complete the main tasks?
Closed-loop outsourcing:Can the system create a closed loop for: outbound shipment, return to factory, inspection, and reconciliation?
Cost Accounting:Can the costs be allocated to each project, rather than being summarized roughly at the end of the month?
Implementation Services:Does the implementation consultant provide on-site support, or does the factory handle the implementation and troubleshooting independently after software delivery?
Industry Case Studies:Are there any customer case studies of similar size and business that we can refer to?
Future Support:After the system goes live, how quickly does the technical support team respond, and do they conduct regular follow-up visits?
Five Key Benefits of Implementing Automated Equipment MES
After establishing a complete automated equipment MES system, factories will experience five clear benefits:
Value 1: Enhanced Visibility of Progress
The progress of each project is immediately clear, so the boss doesn't need to ask every day, and the production manager doesn't need to report based on memory. Problems such as project delays, outsourcing exceeding deadlines, and material shortages can be identified and addressed in a timely manner.
Value Two: Control External Operations
Real-time tracking of the number of external parts sent out, the number returned, the quality, and the reconciliation amount. This avoids disputes with external vendors, uncontrolled costs, and delayed delivery times.
Value Three: Clear Cost Visibility
Accurately calculate the true cost of each project, allowing you to identify profitable and unprofitable projects, and pinpoint the areas of loss. This provides data support for subsequent quoting.
Value Four: Traceability of Quality
Quality issues can be traced back to specific projects, parts, processes, and responsible parties, avoiding situations where "the loudest voice prevails." Accumulate experience data and continuously improve.
Value 5: Data-Driven Decision Making
Long-term accumulated production data can be used to analyze equipment utilization, personnel efficiency, and supplier performance, providing data support for management decision-making.
Conclusion: Don't rush into adopting new concepts; first, focus on controlling the most easily out-of-control aspects of your daily operations.
Automated equipment MES is not simply about purchasing and installing a software package. Instead, it's more like a comprehensive management and organization process that gradually transforms the previously manual, group-chat-based, and experience-dependent aspects into traceable, replayable, and auditable data. If the system is chosen appropriately and the implementation is properly managed, the factory will first see changes in specific areas such as transparent delivery schedules, clear outsourcing, and cost calculation.
Remember these three key points:
First sentence: Implement a pilot program before widespread adoption.Do not implement it all at once; first, select a typical project to run through the core processes.
Second sentence: The boss needs to take the lead in promoting it.MES requires changes to existing work practices, and therefore requires ongoing attention and support from management.
Third sentence: 80% of problems can be solved with 20% of the features.Don't aim for a comprehensive, all-encompassing solution right away. Instead, focus on getting the core functions of progress tracking, work order management, external vendor management, cost control, and quality control running smoothly first.
Don't rush into implementing a concept; first, focus on controlling the most easily out-of-control aspects of your daily operations. This is more effective than simply creating a large, visually appealing dashboard. If you are considering implementing an MES system, consider starting with these three questions: What problems are we most eager to solve? Where are the most critical pain points in the current process? Which functionality will deliver the greatest value?