Solution: Improve machine equipment uptime: Practical Guide: How to increase capacity, Without increasing equipment, Improve the production capacity of mold processing factories.
2026-06-16 08:35:03
Search for "Solution for increasing machine and equipment uptimeThis is the real headache: you've purchased several new machines, but the actual working time per day is less than half, which prevents you from increasing capacity and fulfilling orders. You also don't want to invest another few million in new equipment.
Having worked in the mold machine manufacturing industry for 14 years, we have seen over 100 factories. Most small and medium-sized factories have actual OEE (Overall Equipment Effectiveness) rates between 40% and 50%. By finding the right methods, it is possible to increase OEE by 15% to 20% without adding new equipment, which is equivalent to creating an additional one or two machines' worth of capacity.

Step 1: First, identify exactly where your machines are wasting time.
Many factories' operational rates are actually inaccurate: either they simply assume that "machine running equals work done," or they rely on manual time tracking. Workers only record the time spent actually working, without accounting for time spent waiting for tools, waiting for programs, or idle time due to machine changes. This results in a significant amount of hidden waste that is completely invisible.
Last year, we had contact with a precision mold factory in Suzhou. The owner initially estimated their operating rate at 60%, but after accurately recording the equipment status for each period, they discovered that...The actual effective operating rate is only 41%.The issues of 'not being notified when the upper process is completed, and waiting for half a day for the lower process' and 'machine waiting for the program to be finished' result in approximately 2 hours of wasted time per machine every day. This represents a quarter of the 8-hour workday, which is essentially lost.
| Types of hidden waste | Specific application scenarios | Impact on Availability |
|---|---|---|
| Waiting for waste. | Waiting for the program, waiting for the drawings, waiting for the crane installation, waiting for the upstream processes. | Machine idling or downtime directly consumes effective working hours. |
| Waste due to change of type. | Find knives, find clamps, manual knife sharpening, and remove metal shavings. | Excessive non-processing time leads to reduced equipment uptime. |
| Waste due to failures | Unexpected minor failures lead to downtime, waiting for repair technicians, and waiting for spare parts. | Disrupts the production flow, requiring re-debugging after repair. |
Therefore, the first step in improving overall equipment effectiveness (OEE) is not to pressure workers to work faster, but rather to first identify and eliminate the actual sources of waste. Without identifying the problems, any attempt to improve OEE will be based on guesswork.
Two. Step two: Three actionable improvements that can be implemented quickly and effectively without significant investment.
Instead of making frequent changes to the production line or purchasing new equipment, first implement these three actions. You will be able to see noticeable changes within one or two months.
Action 1: Use a simple method to track the actual status of equipment, and bring waste issues to the forefront.
Many people believe that monitoring equipment status requires installing complex sensors and incurring significant costs. However, this is not necessary.Scan to record workThis allows for immediate problem resolution. Workers can scan the QR code on the machine or workpiece after completing each operation, automatically recording the machine's status (e.g., in operation, idle for mold change, or undergoing repair). This eliminates the need for workers to manually fill out forms, taking only 5 seconds per operation. For example, the Moges work order system is designed in this way, making it easy for frontline workers to adopt.
The hidden waste within the workshop is now clearly visible: for example, if you notice that three machines require a 1-hour wait for tools every morning for a week, simply preparing the tools the day before closing will eliminate this waste directly.
Step 2: Optimize process flow to prevent machines from idling.
The most common waste in mold factories is "idle workers and busy workers": urgent orders come in, and everyone rushes to fulfill them, leaving machines idle while waiting for scheduling; finished parts are thrown into the circulating area after completing a process, and it takes half a day to determine the next process, resulting in machines being idle.
To address this issue, simply achieve the following:Notify upon completion: After the operator scans and completes the task, the system automatically notifies the personnel of the next process and the scheduler, allowing them to immediately see which machines have available time slots and directly assign suitable tasks. One of our clients, after streamlining the workflow, increased the effective processing time of each machine by 1.4 hours per day, resulting in one additional machine's worth of work in half a month.
Step 3: Reduce the waiting time for equipment downtime.
Even seemingly minor issues can take up to two hours to resolve, due to waiting for repairs or parts. You can first address these three small issues:
Compile standard operating procedures (SOPs) for common minor issues on each machine, and post them on the machine itself so that workers can independently resolve minor problems.
Establish a rapid repair channel, allowing workers to report issues directly from their mobile phones. Repair technicians will receive immediate notifications, eliminating the need to search for personnel.
Don't wait until the knife breaks or the parts fail before going out to buy them. It's a waste of time.
Three. Step three: Achieve long-term and stable production efficiency, without relying on manual monitoring, but through automated data management.
Many factories achieve improvements for a period, only to revert to their previous state within two months. The core reason is that human oversight is relied upon. Supervisors cannot continuously monitor several machines and record their status; when order volumes increase, the situation quickly becomes chaotic. At this point, a solution tailored for small mold factories is needed.mold MES Management SystemThis will help you manage this process effectively in the long term.
Many business owners are apprehensive about implementing a system, fearing high costs, complexity, and difficulty in getting their workers to use it. However, there's no need to go for a large, comprehensive system. For mold machine manufacturing plants, the key to increasing productivity is toEquipment status tracking, production reporting, and scheduling.By utilizing these core features, we can solve 80% of the problems. This is the conclusion we have consistently validated: For small and medium-sized factories, 80% of the value comes from the 20% of core features. Avoid unnecessary and unusable features.
Currently, there are also implementation methods specifically designed for small mold factories, such as Moges' five-step implementation method. This involves piloting first and then rolling out the system, focusing on core modules, which allows for normal operation within 3 months. The implementation success rate is over 95%. The system automatically calculates the daily uptime for each machine, identifies areas of waste, and automatically generates reports. Even if the owner is away, they can view the status of each machine in the workshop via their mobile phone, eliminating the need to constantly be in the workshop and effectively managing waste.
IV. Conclusion: Leasing is more cost-effective than purchasing new equipment.
Many business owners, when considering increasing productivity, immediately think about purchasing new equipment and forcing employees to work overtime. However, in most cases, the waste generated by existing equipment is sufficient to meet the demands of increased orders. Instead of spending tens of thousands or even millions of dollars on new equipment, it is more beneficial to first unlock the potential of existing equipment, which is a much lower-risk and faster approach.
Some older managers are also concerned that workers won't be able to use the system. However, the current barcode-based reporting system is no different from using a payment code; even older workers in their 50s and 60s will quickly learn how to use it, so there is no problem with usability.
Why not spend just one hour today to count the machines in your workshop that are most in demand. From the start of your workday to the end, how many actual hours are you actually spending on cutting and processing? Once you've calculated this, you'll likely find that your capacity is much greater than you initially thought.