Non-standard automation project management Excel template: Useful, but why does it become increasingly disorganized over time?

2026-07-02 10:01:50

The essential tool for startups: Why do so many companies prefer using Excel for non-standard projects?

More than 80% of the startup teams we have served among the over 200 non-standard automation equipment manufacturing companies are initially found through online channels.Non-standard automation project management Excel templateInitiate project management.

Everything was fine in the early stages, with a small team of five or six people handling projects, completing around ten projects per year. We didn't need to spend any money on Excel, and we didn't have to learn new things. We could simply open it and start using it. This was definitely a cost-effective solution. However, as the number of projects increased and the team grew to over a dozen people, problems began to arise. For example, the BOM, which we had just updated, was still being used with the old template provided by the procurement department. When the boss asked about the progress of a specific project, the design team said that all the parts had been sent, but the procurement department said that two modules were still outstanding. At the end of the month, when calculating the costs, we realized that we had missed a significant expense for outsourced heat treatment, and we discovered that the project, which had been in progress for half a year, had actually resulted in a loss.

Non-standard automation project management Excel template: Useful, but why does it become increasingly disorganized over time?

Are these issues really caused by the Excel templates you provided?

Managing non-standard projects with Excel: Avoiding the four "inherent flaws"

The core feature of non-standard automation is that each project is customized., Design modifications and BOM adjustments are the norm. This perfectly addresses the weaknesses of Excel. I have seen many factories spend a significant amount of money hiring professional experts to create very complex Excel templates with formulas and macros, but ultimately they were still unusable. The core issues generally stem from the following points::

Common Excel Management IssuesSpecific examples and consequencesHidden losses
Cannot modify multi-level BOMs.Creating Bills of Materials (BOMs) for non-standard equipment can involve thousands of lines, and even a minor change to a core component can have a ripple effect throughout the entire design. Working with Excel for these BOMs is cumbersome, as it's prone to errors, with incorrect formulas and misaligned row numbers being common issues.Purchasing based on the old version resulted in incorrect orders and excessive purchases, leading to capital accumulation and waste.
Version confusion, inconsistent progress.Files were constantly being sent and received: "V3", "V3 - Revised", and others, making it impossible to determine which version was the most up-to-date. Sales, design, and procurement departments each maintained their own versions.Internal disputes and inaccurate external reporting of lead times, leading to customer perception of management chaos.
Cost allocation is entirely manual, resulting in inaccuracies.Standard parts, outsourced processing, in-house processing time, travel expenses must be allocated to individual projects. This is achieved using VLOOKUP for matching, but complex projects can take several hours to complete, and there are frequent instances of missing items.It was discovered after delivery that the project resulted in a loss.Wasted half a year of hard work.
Lack of adequate access control and data security.Everyone with access can view the core pricing and cost information. If a row is accidentally deleted or modified and not saved correctly, a significant amount of work (approximately half a month) will be wasted, and the deleted data will be unrecoverable.Core business secrets leaked, leading to data loss and project delays.

If you absolutely must use Excel templates, they must meet at least these four requirements.

Most Excel templates available online, which are commonly used for general construction or IT projects, are not tailored to the specific business logic of non-standard automation.The core of non-standard projects is BOM-driven processes.. If you absolutely must continue using Excel, you must at least meet the following conditions:

  • Must be divided by part type:Standard parts, self-manufactured parts, and externally sourced parts should be tracked separately. The processes for these three categories of parts are different, and mixing them into a single table makes it easy to miss processing.

  • Ability to automatically calculate procurement gaps:The number of required BOM items minus existing inventory automatically calculates the shortage quantity. Manually subtracting 10 times results in an error rate of 9 times.

  • Project Status Dropdown Options:From project initiation, design, and manufacturing to delivery, all personnel update statuses according to a unified set of rules, eliminating inconsistent and free-form data entry.

  • Provide robust batch import/export interfaces:The BOM generated from 3D software can be directly pasted in, eliminating the need to manually enter hundreds of parts.

However, even if the template meets all requirements, the inherent limitations of the Excel architecture cannot be resolved: conflicts arising from multiple users editing simultaneously, performance issues with large datasets, and the collapse of entire formulas when a single parameter is changed – these are fundamental problems.

Excel Template vs. Professional Customized Project Management System Comparison

Comparison DimensionsExcel Template ManagementProfessional systems (such as Moges PMS9)
BOM ChangesManual modification, prone to errors and omissions, leading to confusion and inconsistencies between related sub-components and versions.One-click change, automatic tracking of historical versions
Multi-user collaborationFiles are constantly being transferred and updated, making it very easy for conflicts to arise.Cloud-based real-time collaboration, with tiered access control.
Missing Material CalculationManual VLOOKUP: Time-consuming and prone to errors.The system automatically compares inventory, and generates purchase orders with a single click.
Single Project Cost CalculationManual data collection at the end of the month often results in omissions and inaccuracies.Automatic material cost collection, real-time viewing of project profits.
Data SecurityProne to accidental deletion and data leakage, lacking backup mechanisms.Enterprise-level encryption, automatic backups, and audit trails.

From Excel to professional management: No need to completely overhaul your system.

Many owners of non-standard manufacturing plants feel that switching systems means completely overturning their existing workflows, forcing everyone to learn new processes, which is a high-cost, high-risk undertaking. In reality, it is completely possible toSmooth transition, starting with the most critical pain points.

For example, a common pain point for most factories is incorrect purchasing orders due to BOM errors. Therefore, the first step is to migrate BOM management from Excel to a professional tool. Modern professional tools are designed with user convenience in mind, for example,Moges PMS9Supports importing and exporting BOM using standard Excel templates. Existing, well-organized Excel files can be directly imported and used. Additionally, the system automatically splits parts based on type, generating corresponding purchase orders, manufacturing orders, and outward delivery orders, all in one step.

How do you determine if it's time to replace your tools?

Many people ask, can I still use Excel, and when should I switch? There's a simple criterion to consider:

  • Also, manage projects in progress.More than 10;

  • Design TeamMore than 5 people;

  • At least 1 hour per day should be allocated toMore than 1 hourVerify data, find versions;

  • Incorrect orders and missing ordersAt least once per month.

When these conditions are met, even the most perfect Excel template will fail. I have seen a 20-person non-standard manufacturing facility that was simultaneously managing 16 projects and employing three full-time clerks to maintain the spreadsheets. Despite this, they were still making two to three errors each month, resulting in a loss of money equivalent to purchasing three systems annually. After switching to a professional tool, only one clerk was needed to handle the workflow, and the error rate dropped by more than 90% within a few months, quickly recouping the initial investment.

Concluding Remarks: The key to selecting the right tool is matching it to your scale.

Starting with a non-standard automation project management Excel template is a very practical choice, especially suitable for startups looking to control costs. However, don't sacrifice business scale just to save on software costs.If you make mistakes on a few orders or lose money on a few transactions, the losses will far exceed the cost of replacing the tools.

The key to selecting the right tool is to match it to your current project scale and team size. This is more important than finding a perfect template.

Moges – Dedicated to non-standard automation and mold manufacturing industry digitalization for 14 years. To learn more about the Moges PMS9 non-standard project management system, please contact us at 186 2522 0688.