No related news
FAQ
Q: How can subcontracting costs be managed as a closed loop?
A: Subcontracting cost must be tied to the project and the part from the moment it is sent out, and return to plant, inspection, warehousing and reconciliation all follow the same record. Avoid three situations: parts sent out with no one following up, parts returned as inspection failures with no cost recorded, and month-end reconciliation that knows only the supplier's total amount but not which project it belongs to. The key is to keep the chain of "send out, receive back, reconcile" unbroken so that each project's subcontracting cost is accurately collected.
Q: Is 3-day delivery for an AI agent real, or is it just a gimmick?
A: 3-day delivery is genuinely feasible, provided the scenario is narrow enough. We have built the underlying capabilities into mature components: multi-model routing, knowledge base parsing, vector retrieval, permission control and so on. When a single-scenario requirement is clear and the materials are complete, delivering a usable version in 3 days is realistic. Kunshan Moges brings 14 years of technical experience accumulated from hundreds of real projects.
Q: Our small cutting tool factory has not deployed a complex ERP system. Can we still use the raw material inventory alert tool?
A: Absolutely. This Moges inventory alert tool was built for the needs of small and medium-sized cutting tool, fixture and gauge factories. No complex integration is required: simply import your inventory data and it works. The operating threshold is low, and the production supervisor can start monitoring it on their own.

