No related news
FAQ
Q: I want to build a small utility Android app. How long will it take, and what about the price and guarantee?
A: Small utility apps fall under basic requirements. For this kind of requirement in custom Android development we offer same-day pickup, and it can be done for only RMB 999. We promise a full refund for dissatisfaction if the finished product does not meet expectations.
Q: What size companies is the Moges system suitable for?
A: The Moges system utilizes a flexible dual-mode architecture, perfectly adapting to mold manufacturing companies of various sizes. For large, group-oriented mold factories, we focus on the production execution layer (MES/APS), seamlessly integrating with mainstream ERP systems such as SAP, Yonyou, and Kingdee through standard API interfaces, enabling bidirectional data synchronization. The system is solely responsible for core manufacturing processes such as production planning and scheduling, workshop reporting, and quality traceability, while financial, procurement, and master data management functions are managed centrally by existing ERP systems. For small and medium-sized independent mold factories (typical scale of 10-100 people), Moges provides a comprehensive business management platform, covering the entire business process from order placement, production, invoicing, and payment, and reimbursement. This platform can be used directly as an ERP system, eliminating the need for additional software investments. This flexible architecture ensures that the system can accompany the company's growth, providing the best management solutions, from small workshops to large groups.
Q: We frequently machine parts wrong and have to rework them, and the back-and-forth pushes delivery out by several days. How can we shorten this through management?
A: Before starting work, organize design, machining and QC for a pre-production drawing review to align dimensional requirements in advance. Perform a first-article inspection for every process, and do not let nonconforming parts flow to the next process. Link the rework rate to team performance so that lead-time losses are reduced at the source.

