No related news
FAQ
Q: What management software is used for ship repair projects?
A: Managing ship repair projects is complex and requires collaboration across multiple disciplines. The Moges Ship Repair System utilizes a "Project Package - Sub-Work Order - Materials" three-tier management model, breaking down large repair projects into specialized sub-tasks such as hull, engine, electrical, and piping, with each sub-work order independently tracking progress, material allocation, and labor hours. The system supports the unique "docking period management" for ship repair, automatically calculating the optimal repair window to avoid incurring high costs due to exceeding docking periods. The materials management module is linked with the shipyard's warehouse, supporting the precise allocation and inventory management of deck materials, spare parts, and consumables, reducing downtime caused by material shortages. The cost calculation module automatically allocates labor, materials, and outsourcing costs for each sub-work order, generating project profit analysis reports. The system also integrates historical ship repair records, documenting the repair history and equipment replacement records for each ship, providing reference for future repairs. Currently used in over 10 shipyards in Nantong, Zhoushan, and other locations, with an average reduction of 18% in repair cycle time and a 25% reduction in material waste.
Q: What specific problems can a lightweight mold management system solve?
A: It mainly solves three core problems: real-time production progress tracking to avoid delivery delays, accurate cost accounting to know the profit or loss of each mold set, and clear outsourcing reconciliation to reduce disputes. It also provides value-added functions such as quality issue traceability and equipment maintenance reminders.
Q: After downloading the app, how do we make sure it is actually adopted?
A: Follow the principle of pilot first and gradual rollout: in the first week, select 1-2 molds currently in production for a pilot, and let key positions (CNC, EDM, bench work) run the flow through first; check at a fixed time every day whether the system data matches the shop floor; focus on validating core steps such as the outsourcing flow and exception records. After the pilot succeeds, expand gradually to the whole factory. Avoid rolling it out everywhere at once, which causes chaos.

