No related news
FAQ
Q: What system should a non-standard automation equipment factory use?
A: The manufacturing of non-standard automation equipment presents challenges such as long project cycles, frequent BOM changes, and high technical requirements. Traditional general systems are unable to meet these needs. The Moges project management system is specifically designed for this niche area, providing a comprehensive solution: supporting dynamic BOM adjustments, allowing for the addition or removal of materials and processes during project execution, and automatically recording change history to ensure traceability; phase delivery tracking functionality breaks down large projects into key milestones such as design, procurement, assembly, and testing, with the ability to set milestones and deliverables, and monitor progress deviations in real-time; the cost aggregation module automatically summarizes material, labor, and outsourcing costs by project, supporting multi-dimensional cost analysis to help precisely control budgets; the document management function centrally stores technical drawings, process documents, and acceptance reports, with version control to ensure the use of the latest documents. The system has been successfully implemented in over 30 automation companies in Suzhou, resulting in an average reduction of 25% in project delivery cycles and a 40% reduction in cost overruns. If you are a manufacturer of non-standard automation equipment, the Moges project management system will be a powerful tool to improve your project management capabilities.
Q: We are just a small mold factory with a few dozen people, and our orders are very mixed. Is it useful to implement a mold manufacturing execution system?
A: Very useful. The biggest headache for small mold factories is mixed, messy and missed orders, and this kind of system is designed specifically for the high-mix, low-volume characteristics of the mold industry. It helps you sort out scheduling and track the progress of every process, so the boss doesn't have to chase each workstation every day, saving a lot of effort.
Q: Is per-project or per-day billing more cost-effective for outsourced gauge design?
A: A fixed per-project price is more cost-effective. Per-day billing puts no constraint on the designer, who may drag the work out and stretch the schedule, making the final total more expensive instead. With a fixed price, state in advance what is included, such as the scope of service, the number of revisions and tolerance verification; the total is fixed with no mid-project increases, so risk is more controllable.

