No related news
FAQ
Q: Which costs are most easily missed in non-standard equipment cost accounting?
A: What is most easily missed is process cost, including design hours (concept review, mechanical design, electrical design, drawing changes), machining hours (labor and machine time for each process), assembly and commissioning hours (mechanism adjustment, cycle time tuning), subcontracting costs (rework, replacement parts, delivery impact) and quality losses (rework, scrap). These costs are often harder to measure than material cost but have a big impact on project profit.
Q: I only have a rough idea and do not understand technology. Can you help me estimate the cost?
A: Yes. Just explain clearly what problem you want to solve and which buttons and flows you need, and we can break down the features and quote. Custom Android utility apps start at RMB 999, and basic features can be delivered the same day. If the plan does not suit you after discussion, you get a full refund - we will not let you spend money in the dark.
Q: We have quite a few machined loose parts coming back from outsourcing, and incoming inspection is always a mess. Can loose-part machining quality inspection management software handle inspection of outsourced parts?
A: Of course it can. When outsourced parts come back, you can open a separate incoming inspection order in the system. The system prompts you to fill in results one by one according to the predefined inspection items; nonconforming parts are rejected directly, and only conforming parts can be put into stock. The inspection records of all outsourced parts can also be archived separately from those of in-house machining, so management is very clear.

