FAQ
Q: How does the Moges production line management system achieve equipment synchronization?
A: The system collects the status of each workstation in real time through device interfaces or a simplified job reporting method. When upstream processes are completed, the system automatically triggers the preparation and start of downstream processes, enabling seamless connection between processes, significantly reducing waiting times, and improving overall production line efficiency.
Q: After downloading the app, how do we make sure it is actually adopted?
A: Follow the principle of pilot first and gradual rollout: in the first week, select 1-2 molds currently in production for a pilot, and let key positions (CNC, EDM, bench work) run the flow through first; check at a fixed time every day whether the system data matches the shop floor; focus on validating core steps such as the outsourcing flow and exception records. After the pilot succeeds, expand gradually to the whole factory. Avoid rolling it out everywhere at once, which causes chaos.
Q: How can subcontracting costs be managed as a closed loop?
A: Subcontracting cost must be tied to the project and the part from the moment it is sent out, and return to plant, inspection, warehousing and reconciliation all follow the same record. Avoid three situations: parts sent out with no one following up, parts returned as inspection failures with no cost recorded, and month-end reconciliation that knows only the supplier's total amount but not which project it belongs to. The key is to keep the chain of "send out, receive back, reconcile" unbroken so that each project's subcontracting cost is accurately collected.