No related news

Contact Us

Now
Contact Us

We deliver professional solutions tailored to our customers' needs. Or share your valuable suggestions so we can improve and grow together!

Contact
Product & Service Inquiry

Free Online Consultation on Products & Solutions

Get a Quote

FAQ

Q: Customers chase us for mold quotes every day, but our calculation takes half a day to produce, and we lose orders easily. How much faster is the automated tool?
A: Manual calculation of the cost of one mold used to take at least half a day, and even an experienced person needed two or three hours. With the automatic calculation tool, you only need to fill in basic parameters such as cavity size, material, and processing requirements, and a complete cost result comes out in about ten minutes. You can meet the customer's deadline and are far less likely to lose the order.

Q: Does rolling out an MES require stopping production? Can workers with limited education use it?
A: There is absolutely no need to stop production. We deploy in phases, piloting on one production line and installing over a weekend or during shift changes; it usually takes only 1-2 days to get it running. The interface uses large icons and large buttons, and workers report by scanning a QR code and tapping "Start" or "Finish", with no typing needed. The system also has voice reminders, and misoperations trigger a red warning, so the data will not be messed up.

Q: Which costs are most easily missed in non-standard equipment cost accounting?
A: What is most easily missed is process cost, including design hours (concept review, mechanical design, electrical design, drawing changes), machining hours (labor and machine time for each process), assembly and commissioning hours (mechanism adjustment, cycle time tuning), subcontracting costs (rework, replacement parts, delivery impact) and quality losses (rework, scrap). These costs are often harder to measure than material cost but have a big impact on project profit.

Latest News

Online Subscription