No related news
FAQ
Q: Our factory already uses an ERP system. Can the newly purchased mold quotation software connect to it?
A: Most mainstream mold industry ERP systems can be integrated, and Moges has prepared many common interfaces in advance, making integration convenient and effortless. You will not need to enter data twice on both sides; once connected, data can be synchronized, saving a lot of ineffective manual work without affecting the normal use of your existing system.
Q: After each mold process is finished, nobody moves it to the next station, so work often sits idle for half a day and delays delivery. How do we solve this?
A: The core issue is that node-level daily clearance management is not in place. Before the end of each shift, each team leader reports the completion status of their own process, and the planner notifies the next process one hour in advance to prepare materials and take over the work. If the waiting time for handover is included in team performance assessment, most idle gaps can be squeezed out.
Q: What key points should I watch when outsourcing gauge design to avoid pitfalls?
A: Three key points: 1) Confirm whether the quote includes tolerance verification, so the machined gauge does not end up unable to measure accurately; 2) Clarify the number of revisions and the charging rules, to prevent arbitrary price hikes; 3) Confirm that the drawing annotations comply with domestic machining standards, to avoid having to redo all the drawings. Nail down these details before signing the contract and you avoid 80% of disputes.

