FAQ
Q: We frequently machine parts wrong and have to rework them, and the back-and-forth pushes delivery out by several days. How can we shorten this through management?
A: Before starting work, organize design, machining and QC for a pre-production drawing review to align dimensional requirements in advance. Perform a first-article inspection for every process, and do not let nonconforming parts flow to the next process. Link the rework rate to team performance so that lead-time losses are reduced at the source.
Q: When I calculate costs I always miss miscellaneous items like outsourcing, heat treatment, and transport, so the result is always lower than actual. Can the automated tool prevent this?
A: Such hidden miscellaneous costs are easy to miss, and manual calculation struggles to account for each one. A dedicated mold cost calculation tool already has these common expense items preset, and you can also add custom expense items based on your own plant's situation, ensuring all spending is covered with no omissions.
Q: I only have a rough idea and no design drawings. Can you still build it?
A: Yes. We first help you clarify the functions, then propose a page plan suited to an Android app. Simple requirements start at RMB 999, and with smooth communication it can be ready the same day. If the result does not match the direction you confirmed, we refund in full when you are not satisfied.