No related news
FAQ
Q: I am a personal tutor with a limited budget. Can you build an education AI agent that is exclusively mine?
A: Of course. Our customization service already covers small and medium-sized practitioners, and it can be done starting at RMB 2999. Unlike ordinary chatbots that apply templates, it can deeply connect to your own teaching content and help share your workload. We deliver in 3 days, with a full refund if you are not satisfied.
Q: Outsourced parts are where problems most easily arise. How should a control process be set up?
A: Managing outsourced parts means watching four key points: how much was sent out (the drawing number, quantity, process and supplier must be clear), when it is due back (you cannot wait until assembly is short of parts to notice), how much came back and how much passed (receipts must match inspection results), and how differences are handled (shortages, rework and scrap must all be recorded). The value of full-process subcontracting management is that the plant knows "though the items are not on site, they are still under control", avoiding the pain of scrolling through chat logs at month-end reconciliation.
Q: For small and medium sheet metal shops adopting nesting software, how do you avoid the situation of buying it and not using it?
A: The key is simplifying the operating flow and defining management rules clearly. It is advisable to start with high-frequency orders and core functions so the nesting engineer quickly sees the efficiency gain; the boss should lead by using system data for decisions; and basic rules should be established, such as unified drawing version management, leftover material numbering with assigned owners, and insertion records. Do not aim for perfection from the start. First let the shop floor form the habit of use, then improve gradually.

