FAQ
Q: We are just a small discrete parts factory with about ten machine tools. Would a scheduling system be too complex and too expensive?
A: Scheduling systems for small and medium discrete parts factories are lightweight-adapted. You do not need to spend a lot on the full-process modules; buying only the scheduling-related functions is enough. Operation is visual drag-and-drop, so a production supervisor can get the hang of it in two or three days. A modest investment solves the chaotic planning problem, which is very cost-effective for a small factory.
Q: When taking a new order in discrete parts machining, we can never tell how much capacity the existing machines have left. Can a scheduling system help?
A: A proper scheduling system aggregates the scheduled load of each machine in real time and automatically calculates remaining capacity. When a new order comes in, enter the order information and it immediately works out whether it can be delivered on time, without visiting each workshop to ask the team leader. It can also recommend the best time slot to insert a rush order, maximizing equipment utilization.
Q: "Saving 4 million annually" - What specific aspects does this refer to?
A: The key benefits are realized across four dimensions: 1. A 30% reduction in lead times, enabling the acceptance of more orders and an annual increase in production value of RMB 3,000,000-5,000,000; 2. A 25% improvement in efficiency, saving RMB 500,000-800,000 in labor costs; 3. A 20% improvement in quality, reducing waste losses by RMB 300,000-500,000; 4. A 30% reduction in inventory, freeing up RMB 400,000-600,000 in circulating funds.