FAQ
Q: Is the investment in an MES system large for small and medium-sized sheet metal factories? How long until it pays for itself?
A: The investment is manageable and the payback is fast. Take a factory with an annual output value of RMB 20,000,000 as an example: recovering just one-third of the cost waste is enough to pay for the system. By improving sheet material utilization and reducing delivery delays, the investment can be recovered in about six months to a year, and everything after that is pure gain.
Q: We are just a small mold factory with a few dozen people, and our orders are very mixed. Is it useful to implement a mold manufacturing execution system?
A: Very useful. The biggest headache for small mold factories is mixed, messy and missed orders, and this kind of system is designed specifically for the high-mix, low-volume characteristics of the mold industry. It helps you sort out scheduling and track the progress of every process, so the boss doesn't have to chase each workstation every day, saving a lot of effort.
Q: What are the basic rules for managing outsourced sheet metal processing?
A: Three basic rules: 1) Every outsourced job must have a standardized handover form noting the drawing number, material, machining requirements, delivery date and unit price, signed by both parties; 2) Register items both on the way out and on the way back, recording issued materials and received goods promptly, and noting the reason for any rejected return; 3) Manage suppliers by tier, keeping 2-3 core suppliers, reviewing quality and delivery every quarter, and dropping the unreliable ones.