FAQ
Q: How do I build a cost accounting system for non-standard equipment projects?
A: The first step is to set up accounts by project, treating each machine as an independent project and creating a project master record with the customer, equipment name, delivery date, owner and contract amount. Then split the cost categories around the project: material cost (standard parts, purchased parts, machined parts, sheet metal parts, electrical parts), process cost (machining, assembly and commissioning hours), subcontracting cost (sending out, return to plant, inspection, reconciliation) and exception cost (rework, scrap, quality issues). All data must hang under the same project number.
Q: Is it easy to connect the system to the processing equipment we already have in the workshop?
A: The Moges hardware parts production system supports integration with most common CNC processing equipment on the market. It automatically captures equipment processing data without manual entry by workers, which saves time and reduces errors, and overall integration is not difficult.
Q: How can mold costs be controlled? How much can the system help companies save on mold costs?
A: The system helps companies control mold modification costs through fine-grained cost management: (1) Automatically collect the labor, material, and outsourcing costs for each mold modification; (2) Analyze the reasons for mold modifications to identify and eliminate unnecessary modifications; (3) Optimize mold modification processes to reduce modification time. Our customers typically see a reduction of 30% or more in mold modification costs, saving RMB 500,000-1,000,000 annually.