FAQ
Q: Which costs are most easily missed in non-standard equipment cost accounting?
A: What is most easily missed is process cost, including design hours (concept review, mechanical design, electrical design, drawing changes), machining hours (labor and machine time for each process), assembly and commissioning hours (mechanism adjustment, cycle time tuning), subcontracting costs (rework, replacement parts, delivery impact) and quality losses (rework, scrap). These costs are often harder to measure than material cost but have a big impact on project profit.
Q: How can I judge whether a vendor's MES system suits us?
A: Listen less to lines like "works for every industry" and ask more specific questions: can the progress of a non-standard machine from project initiation to delivery be seen clearly by project? Can small-batch machining and project-based equipment be managed at the same time? Is shop-floor work reporting simple (can it be done by scanning a code)? Do subcontracting issue, return, inspection and reconciliation form a closed loop? Can costs be attributed to each project? Do implementation consultants provide on-site service? These are what matter.
Q: Can it integrate with our existing attendance machines / MES system?
A: Yes! Data interfaces with mainstream attendance devices (such as ZKTeco and DingTalk) and Moges MES are pre-built, with integration completed within 3 days.