FAQ
Q: How can mold costs be controlled? How much can the system help companies save on mold costs?
A: The system helps companies control mold modification costs through fine-grained cost management: (1) Automatically collect the labor, material, and outsourcing costs for each mold modification; (2) Analyze the reasons for mold modifications to identify and eliminate unnecessary modifications; (3) Optimize mold modification processes to reduce modification time. Our customers typically see a reduction of 30% or more in mold modification costs, saving RMB 500,000-1,000,000 annually.
Q: What are the three most common types of loose-part inventory chaos, and how can they be identified quickly?
A: The most common problems in loose-part inventory are the big three: finding parts, missing parts and wrong parts. Finding: the order is due for assembly but the key part cannot be located. Missing: the system shows stock but the shop floor searches for ages and finds nothing. Wrong: rework parts and accepted parts are stored together, so the wrong one is picked during assembly. A quick way to identify the problem is to look at what the boss asks most often every day: where is the part, why is it not there, and did we pick the wrong one.
Q: How long does AI agent development take?
A: We deliver a usable version in as fast as 3 days, while traditional large vendors start at three months. We have 14 years of technology development experience and have already packaged the common framework, so we only need to adapt it to the specific requirement, which is why we can deliver quickly.