No related news

Contact Us

Now
Contact Us

We deliver professional solutions tailored to our customers' needs. Or share your valuable suggestions so we can improve and grow together!

Contact
Product & Service Inquiry

Free Online Consultation on Products & Solutions

Get a Quote

FAQ

Q: How to efficiently schedule small-batch, multi-product production.
A: Dealing with small-batch, multi-product manufacturing is a common challenge. Moges' "Flexible Production Engine" is designed specifically to address this. The system intelligently sorts orders based on multiple dimensions, including equipment capacity, worker skills, delivery urgency, and material availability, while considering various constraints to automatically generate the optimal production plan. In practice, the system can intelligently merge similar orders to reduce changeovers, reducing average changeover time by 30%. It can also dynamically adjust production rhythms to balance equipment loads and avoid bottlenecks, and respond in real-time to new order requests, automatically assessing the impact and providing adjustment recommendations. More importantly, the system provides a visual production dashboard, allowing planners to manually adjust production plans by simply dragging and dropping. A precision parts factory in Suzhou saw a significant improvement: overall equipment effectiveness (OEE) increased from 58% to 80%, and on-time delivery rate increased from 75% to 95%, resulting in a 35% increase in per-worker output. If you are struggling with the challenges of small-batch, multi-product production, Moges' Flexible Production Engine will provide a significant breakthrough.

Q: What types of Android apps is no-code development suitable for?
A: It is especially suitable for showcase, utility and basic e-commerce apps, and can meet most needs of small and medium-sized entrepreneurs and individual developers, with prices starting from RMB 999.

Q: We do custom automation with frequent requirement changes. How can we actually manage the schedule well?
A: Custom non-standard projects naturally involve frequent requirement changes. First, break the project into detailed milestones such as solution design, drawings, and subcontracting, and set a delivery time and owner for each milestone. Whenever a requirement changes, adjust the overall schedule at the same time and keep the whole team in sync, and things will not easily get out of hand.

Latest News

Online Subscription