No related news
FAQ
Q: Customers chase us for mold quotes every day, but our calculation takes half a day to produce, and we lose orders easily. How much faster is the automated tool?
A: Manual calculation of the cost of one mold used to take at least half a day, and even an experienced person needed two or three hours. With the automatic calculation tool, you only need to fill in basic parameters such as cavity size, material, and processing requirements, and a complete cost result comes out in about ten minutes. You can meet the customer's deadline and are far less likely to lose the order.
Q: A mold factory gets a sudden rush job and the customer is pushing hard. How do we schedule it without delaying existing orders?
A: Do not rush to clear the whole line for it. Break the rush job down to specific processes and see whether it really occupies CNC, EDM, wire cutting, or bench work. Often not all machines conflict, only one bottleneck process does. The value of scheduling software is to find the bottleneck first, then compare which option costs least among inserting the order, overtime, switching machines, and outsourcing. When talking with scheduling solutions like Moges, it is also best to test with real rush order scenarios rather than just looking at the demo interface.
Q: Does MES V4.2 support domestic operating systems?
A: Yes. It uses a Linux-based architecture, is compatible with the Kylin operating system, and has passed the national MLPS Level 3 (Multi-Level Protection Scheme) assessment.

