FAQ
Q: Downtime causes are sometimes unclear. Is it a mold problem, an equipment problem, or a setup problem? How can a system help us tell them apart?
A: The key is not to write just one line like mold abnormality for every downtime. Record the symptom, the handling method, the downtime duration, and the responsibility category. Over time you can see which molds fail repeatedly, which problems recur at the same spot, and which are actually caused by equipment or process parameters. Then improvement meetings are driven by data rather than by feeling.
Q: I usually draw part drawings in CAD. Can they be imported directly for nesting? Do I need to redraw them?
A: No redrawing is needed. Common CAD part drawing formats can be imported directly. Closed contours can be recognized automatically to extract parts, saving you the time of redrawing. With Moges software, irregular drawings can also be cleaned up and corrected automatically, saving a lot of preprocessing effort.
Q: Which costs are most easily missed in non-standard equipment cost accounting?
A: What is most easily missed is process cost, including design hours (concept review, mechanical design, electrical design, drawing changes), machining hours (labor and machine time for each process), assembly and commissioning hours (mechanism adjustment, cycle time tuning), subcontracting costs (rework, replacement parts, delivery impact) and quality losses (rework, scrap). These costs are often harder to measure than material cost but have a big impact on project profit.