- Moges
- 2026-11-27
Machine Equipment Uptime Improvement Plan: A Practical Path to Increasing Uptime from 60% to 80% for Manufacturing Plants
Availability is a core metric for mold factories and machine shops to measure equipment utilization. Simply put, it's the percentage of time that a machine is actually working compared to its total available time. Many factories appear to have machines running, but a closer look at the data reveals a significant amount of "idle time": waiting for orders, waiting for materials, waiting for programming, waiting for maintenance, and waiting for inspection – all of these non-productive pauses can consume up to two or three hours per day for a CNC machine.
- Improving operational efficiency is achieved through a combination of device connectivity, production planning, monitoring, and maintenance.
- Validated by over 200 manufacturing clients, our solution enables standardized management and can increase operational efficiency to 75%~85%.
- The percentage of downtime caused by waiting-related issues exceeds 60%, significantly higher than equipment failures.
- Data acquisition accuracy is 40 times higher than manual methods, and alarm response time is reduced to minutes.
![]()
Let's first compare several typical strategies for improving operational efficiency, so that managers and production supervisors can quickly identify their key areas for improvement:
| Improvement Solution | Suitable for | Implementation Cycle | Expected improvement |
|---|---|---|---|
| Device Network Monitoring | 5~50 machines | 2~3 weeks | +8%~12% |
| MES Production Optimization | 20+ machines | 4~6 weeks | +15%~25% |
| Comprehensive Work Order System | Full-scale | 1~2 weeks | +5%~10% |
| Equipment Maintenance Plan | 10+ key machines | 2 weeks | +3%~7% |
This table clearly demonstrates the limitations of a single solution. The real "improvement solution" comes from combining different approaches. For example, simply connecting devices can identify problems but cannot solve them. Adding MES scheduling allows for proactive reduction in waiting times, and adding maintenance can reduce downtime caused by failures. Below, we will break down each stage in detail.
1. First, identify the specific bottleneck in your operational efficiency.
Many business owners say, "My utilization rate is approximately 70%." When asked how this is calculated, the typical response is "based on worker reports" or "estimated based on electricity meter readings." Inaccurate data leads to incorrect decisions – you might think a machine is idling when it's actually experiencing programming issues, or you might think frequent blade changes are the problem when the actual issue is a poorly organized work order queue.
A reliable approach is to install a data acquisition module on each critical piece of equipment, or to directly read the real-time operating status from the machine's FOCAS/OPC UA interface. Record the three states (running, idle, alarm) once per minute, and collect data for two weeks, and you will be able to see a clear "time usage chart": which periods have the most downtime, what percentage of downtime is caused by which type of issue, and which machines are constantly experiencing "red lights."
With this chart, we can prioritize improvement initiatives. For example, a die-casting parts factory in Kunshan discovered a concentrated downtime period in the afternoons (around 2-3 PM). Further investigation revealed that this downtime was caused by the CNC programming team being overloaded, leading to delays in the completion of tasks. By shifting programming resources to focus on the afternoons, the downtime was reduced by 40%.
Two. Production Scheduling: Providing each machine with a "schedule" that prevents conflicts.
Optimizing production scheduling is the key to increasing overall equipment effectiveness (OEE). Traditional production scheduling relies on Excel or the scheduler's experience, resulting in a "one-at-a-time" approach that requires re-scheduling frequently. This often leads to situations like "this machine waits for the previous job to complete before starting, while that machine has been idle for half an hour."
The MES system can automatically calculate the optimal schedule based on the production route, equipment capabilities, and work order priorities. The core logic is to minimize the waiting time for each machine while ensuring that the order is completed on time. When an urgent order is received, the system will recalculate the entire schedule and provide new production recommendations, which can be confirmed by the scheduler.
For example: A precision mold factory in Suzhou implemented intelligent scheduling, resulting in a reduction in the average daily waiting time for a single machine from 2.4 hours to 0.8 hours – equivalent to an additional 1.6 hours of productive time per day. Based on an output of 200 yuan per machine per hour, this translates to an annual increase of over 100,000 yuan.
Another often overlooked aspect of production optimization is: changeover time. On the same machine, aluminum alloy is processed in the morning, and stainless steel is processed in the afternoon. The changeover time, including tool and fixture changes, may take up to 40 minutes. If the same materials or similar processes are concentrated in the schedule, the changeover time can be reduced to less than 15 minutes. The batch scheduling function in the MES system is designed to achieve this.
3. Real-time Monitoring: Ensuring that anomalies have nowhere to hide.
Once equipment is connected, availability is no longer a report generated at the end of the month, but a real-time number displayed on a wall-mounted dashboard. When a machine remains idle for more than 15 minutes, the system automatically sends a message to the corresponding team leader. When the spindle load increases abnormally, the system provides an early warning of potential tool wear.
The value of this real-time capability lies in: Previously, if a machine broke down, an operator might first go for a drink or find an electrician, and it could take another half hour for the technician to arrive. Now, when the system alerts, the repair team arrives within 5 minutes, reducing the average response time from 45 minutes to less than 10 minutes.
Another benefit of monitoring is data retention. Every downtime reason, duration, and operator are recorded. At the end of the month, a "Downtime Reason Pareto Chart" can be generated, and the top 3 reasons typically account for 80% of the downtime. By identifying these three root causes and focusing on their resolution, overall availability can be significantly improved.
IV. Maintenance Plan: Transform reactive repairs into proactive prevention.
Many factories operate on a "break-fix" model, where equipment is repaired only after it breaks down. For example, a main spindle suddenly jams, causing a three-day shutdown and resulting in losses of tens of thousands of dollars. Proactive maintenance, on the other hand, involves scheduling maintenance and parts replacements based on factors such as the number of operating hours, cutting parameters, and temperature curves for each machine.
For example, spindle maintenance should be performed every 5000 hours, guide rail lubrication every 2000 hours, and coolant replacement every 3 months – these can all be set up as reminders within the system, automatically generating work orders for the maintenance team upon expiration. While preventive maintenance itself takes time, the comparison of a planned shutdown of 4 hours versus an unplanned shutdown of 3 days clearly demonstrates the cost savings.
The Moges MES includes a maintenance management module that can be linked with device acquisition data. For example, if the temperature of a machine's spindle is abnormally high for a continuous week, the system automatically creates a "spindle inspection" maintenance work order. Maintenance personnel arrive and use an infrared camera to check, and they find that the bearings are experiencing early wear. This allows for proactive intervention and prevents major failures later on.
V. Implementation Recommendations: Start small and scale up gradually.
You might be thinking, 'I want to do this too, but the entire system is too expensive upfront.' However, achieving significant improvements in operational efficiency can be done in stages. Start with a smaller, more affordable solution to get things running, and then gradually expand as needed."
In the first phase, select 3~5 key machines for data collection, and you can obtain baseline operational rates within one week. In the second phase, address the 1~2 most prominent downtime reasons (e.g., waiting for work orders) with the lightweight scheduling module. In the third phase, expand to the entire factory, including maintenance and quality modules. This allows for a total investment of between a few thousand and tens of thousands, depending on the size of the factory, offering flexible options.
Moges has been deeply involved in mold industry management for 14 years, serving over 200 manufacturing companies. Our recommendation is: Don't wait for all conditions to be perfect before starting – begin with a single machine or workshop as a pilot, run for three months, and then make decisions based on real data. Many factory owners, after completing a pilot, have the initial reaction: "We actually have so much untapped potential."
Improving operational efficiency is not a software feature, but a data-driven management methodology. Device connectivity is the "eyes," production optimization is the "brain," real-time alerts are the "nervous system," and maintenance plans are the "immune system." When these four elements are integrated, the machine can truly "get running."




