FAQ
Q: What management system is used for ship repair yards?
A: Ship repair operations are characterized by project complexity and scattered work orders. The Moges Ship Repair module supports a "Project-Work Order-Material Issuance" three-level linkage, enabling full task traceability and precise cost collection. The system is specifically designed for the unique needs of ship repair, supporting the management of large repair projects, which are broken down into sub-work orders (hull, engine, electrical), with individual tracking of progress, material issuance, and labor costs, automatically summarizing costs. The project management function covers the entire process, from order placement, assignment, material issuance, to final settlement, supporting the parallel management of multiple projects. The cost calculation module automatically collects material, labor, and outsourcing costs for each project, reducing cost calculation errors from ±15% to ±3%. After being used by more than 50 ship repair facilities, the Moges system has reduced project delivery cycles by 25%, improved cost control accuracy by 40%, and significantly increased customer satisfaction. The system also supports data integration with ship inspection agencies, automatically generating inspection reports, and improving compliance.
Q: I want to build a small Android app. Roughly how much will it cost?
A: Our Android app custom development starts at RMB 999. Small, ordinary requirements can be delivered the same day, and we promise a full refund if you are not satisfied, so it is very cost-effective and well protected.
Q: Our mold workshop is very oily and workers' hands get dirty. Will scanning codes in this system easily cause problems?
A: You don't need to worry about that at all. The system itself supports both mobile devices and industrial fixed control terminals, and the matching scanning devices are oil-resistant industrial models. Even if workers operate with oily hands, recognition is not affected. Everything is adapted to the production environment of a mold workshop, so stability is not a problem.